직벽 및 안전단면 엘형 방음벽 기초 기계화 공법 및 그 장치
    1.
    发明授权
    직벽 및 안전단면 엘형 방음벽 기초 기계화 공법 및 그 장치 有权
    防震墙装备机械方法与装置

    公开(公告)号:KR101159490B1

    公开(公告)日:2012-06-22

    申请号:KR1020110083259

    申请日:2011-08-22

    Abstract: PURPOSE: A mechanization method and a mechanization device of the foundation of an L-shaped soundproof wall are provided to reduce construction time by mechanizing the installation and dismantlement works of a form. CONSTITUTION: A mechanization method of the footing of an L-shaped soundproof wall is as follows. Reinforcing bars(10) of a soundproof wall foundation structure are assembled on the top of lean concrete. Pushing prevention supports(30) for preventing soundproof wall post anchor members from being pushed are installed at positions where soundproof wall posts are to be installed. Lower footing concrete is placed in a form installed to correspond to the bottom of a soundproof wall foundation. Anchor members(40) are installed when the footing concrete is placed. Soundproof wall post anchor members(20) are installed on the pushing prevention supports. The anchor members are connected to each other through steel wires. Upper footing concrete is continuously placed using a concrete placing device having a movable form.

    Abstract translation: 目的:提供L型隔音墙基础的机械化方法和机械化装置,通过机械化安装和拆除工作,缩短施工时间。 构成:L型隔音墙的基础的机械化方法如下。 隔音墙基础结构的加强筋(10)组装在贫混凝土的顶部。 安装隔音墙柱的位置安装用于防止隔音墙后锚固构件被推动的防止支撑件(30)。 底脚下混凝土的安装形式与隔音墙基础底部相对应。 当安装地脚混凝土时,安装锚固件(40)。 隔音墙后锚定构件(20)安装在推动防止支撑件上。 锚定构件通过钢丝彼此连接。 使用具有可移动形式的混凝土浇筑装置连续放置上基础混凝土。

    마사토 비탈면 침식방지 녹화공법
    3.
    发明授权
    마사토 비탈면 침식방지 녹화공법 有权
    用于绿化分解花岗岩土壤坡面的方法

    公开(公告)号:KR101350487B1

    公开(公告)日:2014-01-22

    申请号:KR1020130086999

    申请日:2013-07-23

    CPC classification number: A01G2/00 A01C1/04 E02D17/20

    Abstract: A greening method to control erosion of granite soil slope is disclosed. According to an embodiment of the present invention, the greening method to control erosion of granite soil slope is provided by comprising the steps of: preparing an erosion control stabilizer whose erosion control performance on granite soil slope is verified using a rainfall reproduction device which is capable of reproducing artificial rainfall; mixing to prepare greening materials by mixing water, seeds and fertilizers in the erosion control stabilizer whose erosion control performance described above is verified; spraying to form a vegetation base layer by spraying the greening materials which include the erosion control stabilizer whose erosion control performance described above is verified on granite soil slope. [Reference numerals] (S100) Step of preparing an erosion control stabilizer whose erosion control performance is verified; (S110) Step of preparing greening materials including the erosion control stabilizer whose erosion control performance is verified; (S120) Step of spraying the greening materials on granite soil slope

    Abstract translation: 公开了一种控制花岗岩土坡侵蚀的绿化方法。 根据本发明的一个实施例,通过包括以下步骤来提供控制花岗岩土坡度侵蚀的绿化方法:制备一种侵蚀控制稳定器,其使用能够使用的降雨再生装置对花岗岩土坡的侵蚀控制性能进行验证 人为降雨量; 通过将水,种子和肥料混合在上述腐蚀控制性能的侵蚀控制稳定器中进行混合来制备绿化材料; 通过喷洒包括侵蚀控制稳定器的绿化材料喷洒以形成植被基层,其在花岗岩土坡上验证了上述的侵蚀控制性能。 (附图标记)(S100)制造侵蚀控制稳定器的步骤,其侵蚀控制性能被验证; (S110)制备包括侵蚀控制稳定剂的绿化材料的步骤,其中腐蚀控制稳定剂的侵蚀控制性能得到验证; (S120)在花岗岩土坡上喷洒绿化材料的步骤

Patent Agency Ranking