-
公开(公告)号:JP2003235180A
公开(公告)日:2003-08-22
申请号:JP2002369924
申请日:2002-12-20
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , REHTANZ CHRISTIAN
Abstract: PROBLEM TO BE SOLVED: To make out a method, a computer program, and a system for estimating the state of a power transmission network using less measured values. SOLUTION: In a method, a computer program, and a system for estimating the state of a power transmission network, the phasor measurement of a time stamp is performed by feather measurement instruments (1) arranged in the first set positions (11 and 12) within the network, the phasor of a plurality of voltages or currents is estimated in the second set position, the first set positions (11 and 12) and the second set positions are apart from each other, and the state of network elements (L4, L5, and 13) far away from the phasor measuring instrument is estimated from a phasor estimated value and estimated phasor. COPYRIGHT: (C)2003,JPO
-
公开(公告)号:PL2050176T3
公开(公告)日:2011-11-30
申请号:PL07787793
申请日:2007-07-23
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , KORBA PETR , LEIRBUKT ALBERT , LARSSON MATS
-
公开(公告)号:ES2351844T3
公开(公告)日:2011-02-11
申请号:ES02405576
申请日:2002-07-08
Applicant: ABB RESEARCH LTD
Inventor: LARSSON MATS , REHTANZ CHRISTIAN , ZIMA MAREK
IPC: H02J3/24
Abstract: Un método para la estimación de parámetros en una red eléctrica de potencia, que comprende las etapas de: - la medición, repetida y sincronizadamente, en una pluralidad de localizaciones de la red, de las variables eléctricas de la red; y - la identificación, durante el funcionamiento de la red, de los parámetros válidos actualmente de un modelo matemático de la red eléctrica; caracterizado por que el método comprende - el cálculo, a partir de un modelo matemático que tenga los parámetros actualmente válidos, de una cantidad de potencia para la desconexión de carga correctora que cambie una frecuencia de red predicha hacia una frecuencia de red nominal. en el que - las variables medidas son la frecuencia ω, la potencia absorbida por cada una de la pluralidad de cargas observadas Pc,i y una pérdida de potencia activa total Ppérdida; y - los parámetros identificados comprenden los parámetros de carga actualmente válidos ai, bi, ci, di, que representan una dependencia de la carga de la frecuencia y la tensión.
-
公开(公告)号:DE60327058D1
公开(公告)日:2009-05-20
申请号:DE60327058
申请日:2003-06-21
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , LARSSON MATS , BERTSCH JOACHIM
Abstract: The present invention is concerned with a method for real-time emergency control of power transmission networks, based on a modification of the model predictive control (MPC) approach. Following the detection of a contingency at time tc, only one nominal trajectory xnom is approximated, together with its corresponding trajectory sensitivities for evaluating the effect of various key parameters or potential control actions. An optimum input control is finally identified via the solution of a cost function including e.g. a punishment for excessive load shedding. The process is started only if the nominal trajectory does not remain within acceptable trajectory limits.
-
公开(公告)号:ES2337184T3
公开(公告)日:2010-04-21
申请号:ES06804842
申请日:2006-10-31
Applicant: ABB RESEARCH LTD
Inventor: KORBA PETR , ZIMA MAREK , LARSSON MATS
Abstract: Un método para inicializar una deducción, a partir de parámetros del modelo estimados (a1, a2, ...) de un modelo paramétrico de un sistema de potencia eléctrica (1), de la frecuencia y factor de amortiguación (f, ξ) de un modo de oscilación electromecánico del sistema de potencia (1), en el que la estimación de los parámetros del modelo (a1, a2, ...) se basa en una serie de valores medidos (y21, y22, ...) de una segunda magnitud del sistema (y2) del sistema de potencia (1) y en el que dichos parámetros del modelo (a1, a2, ...) se estiman de forma adaptativa cada vez que se mide un nuevo valor (y2k) de la segunda magnitud del sistema (y2), en el que el método de inicialización comprende - sintonizar un conjunto de parámetros de sintonización (tp2) para la estimación posterior de los parámetros del modelo (a1, a2, ...), caracterizado por que el método comprende además - sintonizar el conjunto de parámetros de sintonización (tp2) copiando los parámetros de sintonización (tp1) sintonizados anteriormente para estimar los parámetros del modelo (a1, a2, ...) en base a una primera magnitud del sistema (y1) del sistema de potencia eléctrica (1), y - determinar una ganancia de acondicionamiento (G2) para escalar los valores medidos (y12, y22, ...) de la segunda magnitud del sistema (y2) antes de cada una de las estimaciones adaptativas de los parámetros del modelo (a1, a2, ...).
-
公开(公告)号:SI1489715T1
公开(公告)日:2009-10-31
申请号:SI200331621
申请日:2003-06-21
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , LARSSON MATS , BERTSCH JOACHIM
-
公开(公告)号:AT289456T
公开(公告)日:2005-03-15
申请号:AT01811253
申请日:2001-12-21
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , REHTANZ CHRISTIAN
Abstract: In a method, computer program and system for estimating a state of an electric power transmission network, time-stamped phasor measurements are made by phasor measurement units (1) located at a first set of locations (11,12) throughout the network, and a plurality of voltage and/or current phasors at a second set of locations is estimated, where the locations of the first (11,12) and second sets of locations are distant from one another, and a status of network elements (L4,L5,13) that are remotely located from the phasor measurement units is inferred from the phasor measurements and the estimated phasors. In a preferred variant of the invention, the network elements are transmission lines (L1...L8), switchgear, under load tap changing transformers, compensation devices (13) or FACTS devices, and the status information describes whether a network element (L4,L5,13) is electrically connected to or disconnected from the network.
-
公开(公告)号:BR0204997A
公开(公告)日:2004-06-29
申请号:BR0204997
申请日:2002-12-09
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , REHTANZ CHRISTIAN
Abstract: In a method, computer program and system for estimating a state of an electric power transmission network, time-stamped phasor measurements are made by phasor measurement units (1) located at a first set of locations (11,12) throughout the network, and a plurality of voltage and/or current phasors at a second set of locations is estimated, where the locations of the first (11,12) and second sets of locations are distant from one another, and a status of network elements (L4,L5,13) that are remotely located from the phasor measurement units is inferred from the phasor measurements and the estimated phasors. In a preferred variant of the invention, the network elements are transmission lines (L1...L8), switchgear, under load tap changing transformers, compensation devices (13) or FACTS devices, and the status information describes whether a network element (L4,L5,13) is electrically connected to or disconnected from the network.
-
公开(公告)号:ES2367399T3
公开(公告)日:2011-11-03
申请号:ES07787793
申请日:2007-07-23
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , KORBA PETR , LEIRBUKT ALBERT , LARSSON MATS
Abstract: Un procedimiento de estimación de unos parámetros de modelo (A, B,...; C1,...) de un modelo térmico de una línea de alta tensión (10), que comprende - medir unos valores de una magnitud eléctrica (I, P) de la línea de alta tensión y de unas magnitudes meteorológicas (Ta, S, W) que representan unas condiciones ambientales de la línea de alta tensión, y - calcular unos valores de los parámetros de modelo a partir de dichos valores medidos, caracterizado porque el procedimiento comprende - medir, repetidamente durante el funcionamiento de la línea de alta tensión, unos valores temporales (I i , Ta i , S i , W i ) de las magnitudes eléctricas y meteorológicas, - medir de forma concurrente un valor temporal (T1 i ) de una temperatura (T1) de la línea de alta tensión, y - calcular, repetidamente durante el funcionamiento de la línea de alta tensión, los valores (A i , B i ;...; C1 i ,...) de los parámetros de modelo a partir de dichos valores medidos.
-
公开(公告)号:SI2050176T1
公开(公告)日:2011-10-28
申请号:SI200730722
申请日:2007-07-23
Applicant: ABB RESEARCH LTD
Inventor: ZIMA MAREK , KORBA PETR , LEIRBUKT ALBERT , LARSSON MATS
-
-
-
-
-
-
-
-
-