    Abstract: The present invention is concerned with an operation of a wind farm with a plurality of wind turbines in view of a dynamic frequency response. According to the invention, dynamic frequency support and power production for all wind turbines in a wind farm are handled concurrently in a single optimization step and taking into account wake effects within the wind farm as well as optional wind forecast information. The dynamic frequency support capability of the entire wind farm is planned in advance according to grid requirements and power system condition changes. While existing methods de-load wind turbines with a static percentage in order to supply additional power when needed, the proposed method incorporates the dynamic frequency support into the optimal operation system of wind farm.

    Abstract translation: 考虑到动态频率响应,本发明涉及具有多个风力涡轮机的风电场的操作。 根据本发明,风力发电场中的所有风力涡轮机的动态频率支持和功率生产在单个优化步骤中同时处理,并且考虑到风电场内的尾流效应以及可选的风力预报信息。 根据电网要求和电力系统状况变化,预先计划整个风电场的动态频率支持能力。 虽然现有方法以静态百分比排除风力涡轮机,以便在需要时提供额外的功率,但所提出的方法将动态频率支持融入到风电场的最优操作系统中。

    OPTIMAL WIND FARM OPERATION
    4.
    发明公开
    OPTIMAL WIND FARM OPERATION 审中-公开
    优化风电场运行

    公开(公告)号:EP3237752A1

    公开(公告)日:2017-11-01

    申请号:EP15802119.6

    申请日:2015-12-01

    Applicant: ABB Schweiz AG

    Abstract: The present invention relates to a method of operating a wind farm comprising an upstream and a downstream turbine, wherein the upstream turbine is operated with current operation parameters under current wind conditions, wherein the method comprises the steps of: receiving future wind conditions for a time period for the wind farm, and evaluating required operation parameters for minimising wake effect of the downstream turbine under the future wind conditions, and determining a cost coefficient for changing the operation parameters to required operation parameters under consideration of fatigue effect of the wind turbine, calculating power productions P 0 and P c , in the predetermined time period, by the wind farm if operated with the current operation parameters under the current wind conditions and if operated with the required operation parameters under the future wind conditions, respectively, and operating the upstream turbine with the required operation parameters if the cost coefficient is lower than a cost that would be obtained by a power production increment P c - P 0 .

    Abstract translation: 本发明涉及一种操作包括上游和下游涡轮机的风电场的方法,其中上游涡轮机在当前风况下利用当前操作参数来操作,其中该方法包括以下步骤:接收未来风力条件一段时间 并评估所需的运行参数以最小化未来风力条件下的下游涡轮机的尾流效应,并且在考虑风力涡轮机的疲劳效应的情况下确定用于将运行参数改变为所需运行参数的成本系数,计算 如果在当前风力条件下以当前运行参数运行并且如果在未来风力条件下分别以所需运行参数运行,则在预定时间段内由风力发电场产生电力产生P o和P c, 如果成本为c,则需要运行参数的涡轮机c 效率低于通过发电量增量P c -P o获得的成本。