-
1.
公开(公告)号:US11867763B2
公开(公告)日:2024-01-09
申请号:US17136116
申请日:2020-12-29
Applicant: ABB Schweiz AG
Inventor: Jiayang Ruan , Niya Chen , Rongrong Yu
IPC: G01R31/327
CPC classification number: G01R31/3275
Abstract: A method and system for monitoring condition of a fleet of circuit breakers includes: measuring at least one type of operating condition related signal for the respective circuit breakers during their operation; obtaining a set of feature data representing the respective measurements of operating condition related signal; performing cluster analysis of the set of feature data based on a similarity threshold; and generating a signal indicating the condition of the fleet of circuit breakers based on the resulting cluster number. Rather than comparing the data representing the measurements of operating condition related signal to a reference model built on CB's normal data, the method includes applying cluster analysis of the set of feature data representing the respective measurements of operating condition related signal. The method does not need a reference “normal” database for comparison.
-
公开(公告)号:US10288043B2
公开(公告)日:2019-05-14
申请号:US15359976
申请日:2016-11-23
Applicant: ABB Schweiz AG
Inventor: Rongrong Yu , Niya Chen , Yao Chen
Abstract: The present application includes wind turbine condition monitoring method and system. The method includes: acquiring historical SCADA data, and wind turbine reports corresponding to the historical SCADA data; training an overall model for overall diagnosing the wind turbine, and training different individual models for analyzing different components of the wind turbine based on the historical SCADA data and the corresponding wind turbine report, by establishing relationship between the historical SCADA data and the wind turbine report; acquiring real time SCADA data, inputting the real time SCADA data to the trained overall model, obtaining the health condition of the wind turbine from the trained overall model, and performing individual diagnosing step if the trained overall model determines wind turbine as defective status; inputting the real time SCADA data to the trained individual model corresponding to the defective component, and obtaining the fault details of the defective component from the trained individual model corresponding to the defective component.
-
公开(公告)号:US20200271095A1
公开(公告)日:2020-08-27
申请号:US15930760
申请日:2020-05-13
Applicant: ABB Schweiz AG
Inventor: Rongrong Yu , Niya Chen , Hailian Xie , Jiayang Ruan , Olli Alkkiomaki
Abstract: A method for wind converter management, data of a first set of measurements may be collected from respective wind converters in a group of wind converters. Data distributions for the respective wind converters may be obtained based on the collected data. A condition of a first wind converter in the group of wind converters may be determined based on the obtained data distributions.
-
公开(公告)号:US20180286557A1
公开(公告)日:2018-10-04
申请号:US16000571
申请日:2018-06-05
Applicant: ABB Schweiz AG
Inventor: Yao Chen , Niya Chen , Rongrong Yu
IPC: H01F27/08 , H05K7/20 , H01F27/33 , H01F27/00 , G05B19/408
Abstract: A method for controlling cooling system of a power equipment and a system using the same. The method includes steps of: obtaining a first data set representing operational cost related parameters specific to the power equipment and its cooling system at a series of time intervals of a first load cycle in a history profile; obtaining a second data set representing operational cost related parameters specific to the power equipment and its cooling system at a series of time intervals of a second load cycle in the history profile, where the second load cycle follows the first load cycle; in consideration of the parameters represented by the first data set, through knowledge-based predetermined numerical and/or logical linkages, establishing a third data set representing optimal cooling capacity parameters for the cooling system at the series of time intervals of the first load cycle according to criteria for operational cost optimization of the power equipment; in consideration of the parameters represented by the second data set, through knowledge-based predetermined numerical and/or logical linkages, establishing a fourth data set representing optimal cooling capacity parameters for the cooling system at the series of time intervals of the second load cycle according to criteria for operational cost optimization of the power equipment; establishing a fifth data set representing a cooling capacity parameter difference between the established cooling capacity parameters concerning the first load cycle and the second load cycle; establishing a sixth data set representing cooling capacity parameters for the cooling system at a series of time intervals of a present load cycle by computationally correcting the established cooling capacity parameter concerning the time intervals of the second cycle load with use of the cooling capacity parameter difference; and controlling the cooling system to operate at a series of time intervals of the present load cycle at the stablished cooling capacity parameters concerning the present load cycle represented by the sixth data set.
-
公开(公告)号:US20180268981A1
公开(公告)日:2018-09-20
申请号:US15988407
申请日:2018-05-24
Applicant: ABB Schweiz AG
Inventor: Yao Chen , Niya Chen , Rongrong Yu
CPC classification number: H01F27/085 , G05B13/021 , H01F27/08 , H01F27/12 , H01F27/33 , H01F27/42 , H05K7/20
Abstract: One embodiment of the present application provides a method for obtaining a first data set representing operational cost related parameters specific to the power equipment and its cooling system forecasted for a series of time intervals of present load cycle in consideration of a second data set representing operational condition related parameters for the power equipment forecasted for a series of time intervals of present load cycle; in consideration of the parameters represented by the first data set, through knowledge-based predetermined numerical and/or logical linkages, establishing a third data set representing cooling capacity parameters for the cooling system at the series of time intervals of the present load cycle according to criteria for operational cost optimization of the power equipment and its cooling system for the present load cycle; and in the present load cycle, controlling the cooling system to operate at the cooling capacity parameters at the series of time intervals represented by the established third data set.
-
公开(公告)号:US11168669B2
公开(公告)日:2021-11-09
申请号:US16737982
申请日:2020-01-09
Applicant: ABB Schweiz AG
Inventor: Rongrong Yu , Niya Chen , Hailian Xie , Jiayang Ruan , Antti Vinko
Abstract: A method for wind converter management, first and second data associated with a group of first measurements and a second measurement of the wind converter may be collected respectively. An association between the group of first measurements and the second measurement of the wind converter may be obtained. A condition of the wind converter may be determined based on a comparison of the collected first and second data and the obtained association. Also, the apparatuses, systems, computer readable media and IoT systems for wind converter management.
-
公开(公告)号:US20210199707A1
公开(公告)日:2021-07-01
申请号:US17178521
申请日:2021-02-18
Applicant: ABB Schweiz AG
Inventor: Jiayang Ruan , Niya Chen , Rongrong Yu , Kai Hencken , Joerg Lehmann
IPC: G01R31/12
Abstract: A method and system for condition monitoring electrical equipment includes detecting partial discharge impulses generated in the electrical equipment for at least one power cycle; obtaining first data representing the detected partial discharge impulses for the at least one power cycle; obtaining second data by phase-resolving the first data; obtaining third data by regularizing the second data; analyzing the third data into a first component and at least one second component; obtaining phase information of the first component; shifting the first component and the at least one second component in consideration of the obtained phase information; and generating a signal indicating a health state of the electrical equipment by comparing the shifted first and second components of the third data with their counterparts associated with an unhealthy electrical equipment.
-
8.
公开(公告)号:US20210116504A1
公开(公告)日:2021-04-22
申请号:US17136116
申请日:2020-12-29
Applicant: ABB Schweiz AG
Inventor: Jiayang Ruan , Niya Chen , Rongrong Yu
IPC: G01R31/327
Abstract: It provides a method for monitoring condition of a fleet of circuit breakers and a system and an internet of things using the same. The method includes: (a) measuring at least one type of operating condition related signal for the respective circuit breakers during their operation; (b) obtaining a set of feature data representing the respective measurements of operating condition related signal; (c) performing cluster analysis of the set of feature data based on a similarity threshold; and (d) generating a signal indicating the condition of the fleet of circuit breakers based on the cluster number resulted from the step (c). Rather than comparing the data representing the measurements of operating condition related signal to a reference model built on CB's normal data, the embodiment according to present invention applies cluster analysis of the set of feature data representing the respective measurements of operating condition related signal. The method does not need a reference “normal” database for comparison.
-
9.
公开(公告)号:US12255033B2
公开(公告)日:2025-03-18
申请号:US16521976
申请日:2019-07-25
Applicant: ABB Schweiz AG
Inventor: Niya Chen , Xin Zhang , Jiayang Ruan , Rongrong Yu
IPC: H01H71/04 , G01R31/327
Abstract: A method for monitoring a circuit breaker and an apparatus and an internet of things using the same. The method includes: obtaining a first data set representing force applied to a fixed point of an element of an actuating mechanism of the circuit breaker in present operation cycle, judging a health condition of the circuit breaker in consideration of normal operating condition related parameters of the element according to a history profile when the circuit breaker operated normally and current operating condition related parameters of the element in the present operation cycle extracted from the force represented by the first data set, and generating a signal indicating the health condition of the actuating mechanism of the circuit breaker. The force applied to the fixed point of the actuating mechanism of the circuit breaker, which corresponds to a health condition of mechanical parts of the circuit breaker as a whole, is selected as an indicator for condition monitoring of the mechanical parts of the circuit breaker. The operating condition related parameters derived from the measurements of the force are considered giving a relatively high accurate judgement of the whole mechanical parts of the circuit breaker.
-
公开(公告)号:US10137796B2
公开(公告)日:2018-11-27
申请号:US14896170
申请日:2014-10-31
Applicant: ABB Schweiz AG
Inventor: Xing Huang , Rongrong Yu , Yao Chen , Hector Zelaya De La Parra
Abstract: A control system for an electric vehicle charging station (EVCS) is provided, the control system comprises: a central controller configured to receive an ancillary service order from a power grid and distribute the ancillary service order to one or more local controllers periodically; and the one or more local controllers configured to control a plurality of electric vehicle supply devices based on the distributed ancillary service order in real time. The method controlling the electric vehicle charging station (EVCS) is also provided.
-
-
-
-
-
-
-
-
-