-
公开(公告)号:JP2000284809A
公开(公告)日:2000-10-13
申请号:JP30149499
申请日:1999-09-16
Applicant: BASF AG
Inventor: FULL JOACHIM , ARMBRUSTER HARALD , REHMER GERD DR , NAHSTOLL JUERGEN DR
IPC: G05B15/02 , G05B19/418 , G06Q50/00 , G06F17/60
Abstract: PROBLEM TO BE SOLVED: To provide a satisfactory process order even when an order of manufacturing plan is collapsed. SOLUTION: This manufacturing control method is executed according to the manufacturing plan and in the manufacturing control method of separable chemical processes to be used for manufacturing plural generated products A, B, C at a plurality of stages 1, 2, 3, a measured value based on an operation parameter at least one stage of the stages 1, 2, 3 is recorded, monitored, a signal is generated when the measured value exceeds a limit value, the manufacturing plan is calculated again, based on the signal and the processes, are executed, based on a new manufacturing plan of the stages 1, 2, 3.
-
公开(公告)号:AT229662T
公开(公告)日:2002-12-15
申请号:AT99117923
申请日:1999-09-14
Applicant: BASF AG
Inventor: FULL JOACHIM , REHMER GERD DR , ARMBRUSTER HARALD DR , NAHSTOLL JUERGEN DR
IPC: G05B15/02 , G05B19/418 , G06Q50/00
-
公开(公告)号:DE59903724D1
公开(公告)日:2003-01-23
申请号:DE59903724
申请日:1999-09-14
Applicant: BASF AG
Inventor: FULL JOACHIM , REHMER GERD , ARMBRUSTER HARALD , NAHSTOLL JUERGEN
IPC: G05B15/02 , G05B19/418 , G06Q50/00
-
公开(公告)号:DE19842482A1
公开(公告)日:2000-03-23
申请号:DE19842482
申请日:1998-09-16
Applicant: BASF AG
Inventor: FULL JOACHIM , ARMBRUSTER HARALD , REHMER GERD , NAHSTOLL JUERGEN
IPC: G05B15/02 , G05B19/418 , G06Q50/00 , B01J19/00
-
-
-