INSTALLATION SYSTEM FOR AFT AIRCRAFT MONUMENT ASSEMBLY
    2.
    发明公开
    INSTALLATION SYSTEM FOR AFT AIRCRAFT MONUMENT ASSEMBLY 审中-公开
    安装AFT飞机表总成的安装系统

    公开(公告)号:EP3212500A1

    公开(公告)日:2017-09-06

    申请号:EP15854147.4

    申请日:2015-10-30

    Abstract: A method of positioning a monument within an aircraft. The method includes positioning first and second tracks having first and second carriages thereon on the floor. The first and second carriages are initially in a first position. The method includes positioning a floor of a first monument section with a first fitting on the carriage of the first track, positioning a floor of a second monument section with a second fitting on the carriage of the second track, moving the first and second monument sections with the carriages to a second position, aligning the first fittings with a connection point on the aircraft floor, raising the floors of the first and second monument sections and removing the first and second tracks, lowering the floors of the first and second monument sections, securing the first and second fittings to the connection points associated therewith.

    Abstract translation: 在飞机内定位纪念碑的方法。 该方法包括将其上具有第一和第二滑架的第一和第二轨道定位在地面上。 第一和第二滑架最初处于第一位置。 该方法包括将具有第一配件的第一建筑物部分的地板定位在第一轨道的托架上,将第二建造物部分的地板与第二配件定位在第二轨道的托架上,移动第一和第二建造物部分 将滑架移动到第二位置,将第一配件与飞机地板上的连接点对齐,抬升第一和第二建筑物部分的地板并移除第一和第二轨道,降低第一和第二建筑物部分的地板, 将第一和第二配件固定到与其相关的连接点。

    INSTALLATION SYSTEM FOR AFT AIRCRAFT MONUMENT ASSEMBLY
    3.
    发明申请
    INSTALLATION SYSTEM FOR AFT AIRCRAFT MONUMENT ASSEMBLY 审中-公开
    AFT飞机纪念大会安装系统

    公开(公告)号:WO2016070118A1

    公开(公告)日:2016-05-06

    申请号:PCT/US2015/058450

    申请日:2015-10-30

    Abstract: A method of positioning a monument within an aircraft. The method includes positioning first and second tracks having first and second carriages thereon on the floor. The first and second carriages are initially in a first position. The method includes positioning a floor of a first monument section with a first fitting on the carriage of the first track, positioning a floor of a second monument section with a second fitting on the carriage of the second track, moving the first and second monument sections with the carriages to a second position, aligning the first fittings with a connection point on the aircraft floor, raising the floors of the first and second monument sections and removing the first and second tracks, lowering the floors of the first and second monument sections, securing the first and second fittings to the connection points associated therewith.

    Abstract translation: 在飞机内定位纪念碑的方法。 该方法包括将第一和第二轨道的第一和第二轨道定位在地板上。 第一和第二支架最初处于第一位置。 该方法包括将具有第一配件的第一纪念碑部分的地板定位在第一轨道的托架上,将具有第二配件的第二纪念碑部分的地板定位在第二轨道的托架上,使第一和第二纪念碑部分移动 将所述托架移动到第二位置,使所述第一配件与所述飞机地板上的连接点对准,升高所述第一和第二纪念碑部分的地板并且移除所述第一和第二轨道,降低所述第一和第二纪念碑部分的地板, 将第一和第二配件固定到与其相关联的连接点。

Patent Agency Ranking