METHOD FOR APPLYING DISPERSION COATING TO FLOW PATH OF CYLINDRICAL HONEYCOMB CATALYST CARRIER

    公开(公告)号:JPH11314041A

    公开(公告)日:1999-11-16

    申请号:JP6215599

    申请日:1999-03-09

    Applicant: DEGUSSA

    Abstract: PROBLEM TO BE SOLVED: To provide a method for filling a flow path orientated perpendicularly in a cylindrical honeycomb catalyst carrier with a filling amount of coating dispersion through the bottom face of the catalyst carrier, next emptying and performing the clearing extraction of the flow path as well as drying/calcining the catalyst carrier and coating the cylindrical honeycomb catalyst carrier with a dispersion coating. SOLUTION: This method is composed of a) a step to fill a flow path with filling amount which is about 10% larger than the empty volume of the flow path so that a coating dispersion exceeds the upper face of a catalyst carrier after the completion of a filling cycle, b) a step to remove the excess amount of the coating dispersion at the top before the emptying of the flow path and c) a step to empty and perform the clearing extraction by an extraction impulse to be generated by the connection of the bottom face of the catalyst carrier to a vacuum tank. Thus the time between the beginning of the filling cycle and the end of the emptying and clearance extraction amounts to no more than 5 seconds.

    Process for the coating of the flow channels of a honeycomb form catalytic converter carrier with a dispersion coating

    公开(公告)号:MX9902322A

    公开(公告)日:2000-09-30

    申请号:MX9902322

    申请日:1999-03-10

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

    Process for the coating of the flow channels of a honeycomb form catalytic converter carrier with a dispersion coating.

    公开(公告)号:ZA991899B

    公开(公告)日:1999-09-27

    申请号:ZA991899

    申请日:1999-03-09

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

    5.
    发明专利
    未知

    公开(公告)号:BR9903037A

    公开(公告)日:2000-05-09

    申请号:BR9903037

    申请日:1999-03-10

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

    METHOD OF COATING FINE-PASSAGE DUCTS IN A CAPILLARY CATALYST SUPPORT MEDIUM BY A SUSPENSION COATING PROCESS

    公开(公告)号:PL331816A1

    公开(公告)日:1999-09-13

    申请号:PL33181699

    申请日:1999-03-08

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

    8.
    发明专利
    未知

    公开(公告)号:DE19810260C2

    公开(公告)日:2000-02-24

    申请号:DE19810260

    申请日:1998-03-10

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

    9.
    发明专利
    未知

    公开(公告)号:DE19810260A1

    公开(公告)日:1999-09-16

    申请号:DE19810260

    申请日:1998-03-10

    Applicant: DEGUSSA

    Abstract: The channels (1) are filled (11) from below, with a quantity up to 10% greater than their empty volume, until the dispersion rises above the upper surface (17). The excess is removed (8, 9) before emptying the channels. Impulsive suction from a low pressure vessel (5) connected with the lower end face of the substrate (1), then clears the passages. The interval between starting to fill and completion of emptying, is no longer than 5 seconds. Preferred Features: The (partial) vacuum vessel (5) has an initial pressure of 150 mbar and a volume 100-1000 times that of the catalyst substrate. During suction, a minimum air velocity of 5 m/s is maintained in the channels. The open flow cross section to the vacuum vessel is adjustable from 0 to a maximum value. When thixotropic or intrinsically-viscous dispersions are used, the interval between filling and sucking-out is so short, that the limit of flowability cannot set in. The substrate is moistened before coating and may be pre-impregnated with acids, bases or salt solutions. Following emptying of the flow channels, before firing, a flow of heated dry air at 50-80 degrees C is passed. This is delivered against the direction of emptying, at a speed of 2-10 m/s, over an interval of 2-60 seconds.

Patent Agency Ranking