-
公开(公告)号:JP2001312713A
公开(公告)日:2001-11-09
申请号:JP2001021402
申请日:2001-01-30
Applicant: IBM
Inventor: JEROME M KERTZBERG , LEVANONI MENACHEM
Abstract: PROBLEM TO BE SOLVED: To provide a method and a device for functionally strengthening rack space management. SOLUTION: This method is provided with a step for providing rack space requirement database containing the summary of each of rack space requirement histories, a step for providing a rack space availability database containing the summary of at least one of rack space management solution, rack space information and rack space diagnosis, and a step for using the data mining technology for inquiring the problem of rack space requirements to the rack space requirement database and the rack space availability database for generating an output data steam correlated to the rack space availability solution.
-
公开(公告)号:JPH1125182A
公开(公告)日:1999-01-29
申请号:JP15117598
申请日:1998-06-01
Applicant: IBM
Inventor: JEROME M KERTZBERG , MENACHEM REBANONI
Abstract: PROBLEM TO BE SOLVED: To execute an industrial experiment plan by deciding the ranking of manufacture process variables and the interaction, utilizing the decided ranking and using a biased experiment plan. SOLUTION: A manufacture process is provided with two variables, the experiment plan without bias as complete contrast by the variables is indicated as a reference number 10 and up to three levels are used for the respective variables. That is, in the case that on-going knowledge relating to the process specifies that a first variable X1 is provided with weight 10, a second variable X2 is provided with the weight 4 and the interaction between X1 and X2 is provided with the weight 6, 5 is defined for X1, 2 is defined for X2, 3 is defined for the interaction between X1 and X2 and rounding to the total of 10 points is performed. Thus, the industrial experiment plan is made possible.
-