Wood Retaining Wall and Construction Method thereof
    1.
    发明公开
    Wood Retaining Wall and Construction Method thereof 有权
    木挡土墙及其施工方法

    公开(公告)号:KR20120055773A

    公开(公告)日:2012-06-01

    申请号:KR20100116885

    申请日:2010-11-23

    Abstract: PURPOSE: A wood retaining wall for improving supporting force using a stiffener buried in back filling soil and a construction method thereof are provided to improve cost-efficiency by reducing materials required for constructing the wood retaining wall. CONSTITUTION: A wood retaining wall for improving supporting force using a stiffener buried in back filling soil is composed as follows. Longitudinal members(300) are arranged in a longitudinal direction. Front horizontal members(100) are placed on the longitudinal members at right angles to the longitudinal members. Intersection fastening members(10) are arranged on the intersections of the front horizontal and longitudinal members. Support members(20) are arranged between the first-row longitudinal members and the second-row longitudinal members and support the rears of the longitudinal members. Stiffener binding members(50) are coupled to the support members. When the back filling soil is excavated, stiffeners(60) buried in the back filling soil are coupled to the stiffener binding members.

    Abstract translation: 目的:提供一种用于改善支撑力的木材挡土墙,该支撑力使用埋在后填土中的扶强材及其施工方法,以通过减少构造木材挡土墙所需的材料来提高成本效率。 构成:使用埋在后填土中的扶强材改善支撑力的木挡土墙组成如下。 纵向构件(300)沿纵向排列。 前水平构件(100)与纵向构件成直角地放置在纵向构件上。 交叉连接构件(10)布置在前水平和纵向构件的交叉点上。 支撑构件(20)布置在第一排纵向构件和第二排纵向构件之间并且支撑纵向构件的翼部。 加强结合构件(50)联接到支撑构件。 当填充土壤被挖掘时,埋在后填土中的加强筋(60)与加强筋结合构件相连接。

    Wood retaining wall and construction method thereof
    2.
    发明授权
    Wood retaining wall and construction method thereof 有权
    木材保留墙及其施工方法

    公开(公告)号:KR101313778B1

    公开(公告)日:2013-10-01

    申请号:KR20130032163

    申请日:2013-03-26

    Abstract: PURPOSE: A reinforced earth retaining wall using a front vertical support made of rectangular lumber and a construction method thereof are provided to build an environmentally friendly reinforced earth retaining wall by exposing the upper surface of soil on the rear side to plant vegetation. CONSTITUTION: A construction method of a reinforced earth retaining wall using a front vertical support made of rectangular lumber comprises the following steps: arranging a plurality of lateral support posts side by side in a lateral direction; uprightly joining front vertical supports to the top of the lateral support posts; separately joining rear vertical supports on the top of the lateral support posts on the rear side of the front vertical supports; forming a front surface by sequentially layering a plurality of front panels on spaces between the rear vertical supports; forming a single banking layer by filling the top of lateral support posts and the rear side of the front surface with rear earth and sand (700); and repeating the above steps to form a plurality of banking layers.

    Abstract translation: 目的:使用由矩形木材制成的前垂直支撑的加固土挡墙及其施工方法,通过将后侧土壤的上表面暴露于植被来建造环境友好的增强土挡土墙。 构成:使用由矩形木材制成的前垂直支撑件的加强土挡土墙的施工方法包括以下步骤:沿横向方向并排布置多个横向支撑柱; 将前垂直支撑件垂直地连接到横向支撑柱的顶部; 在前垂直支撑件的后侧上的侧支撑柱的顶部上分别连接后垂直支撑件; 通过在后垂直支撑件之间的空间上顺序地分层多个前面板来形成前表面; 通过填充侧支撑柱的顶部和前表面的后侧用后部砂土(700)形成单个银行层; 并重复上述步骤以形成多个银行层。

    Earth retaining implement using static soil pressure
    3.
    发明公开
    Earth retaining implement using static soil pressure 有权
    使用静态土压力进行地球保持实施

    公开(公告)号:KR20100117429A

    公开(公告)日:2010-11-03

    申请号:KR20090036187

    申请日:2009-04-24

    CPC classification number: E02D17/04 E02D17/20 E02D27/50 E02D2200/1628

    Abstract: PURPOSE: An earth retaining implement using static soil pressure is provided to simplify a working process by reducing the amount of struts and to reduce construction costs. CONSTITUTION: An earth retaining implement using static soil pressure comprises piles(130), and a retaining support(150). The piles are installed by excavating the ground. Earth plates(110) are installed in the excavated ground. The piles are fixed to the contiguous ground using an anchor(190). The retaining support is connected to the piles and supports a waling(170) installed in the excavated ground.

    Abstract translation: 目的:提供使用静态土压力的土方工具,通过减少支柱的数量和降低施工成本来简化工作过程。 构成:使用静态土壤压力的土方工具包括桩(130)和保持支撑件(150)。 这些桩是通过挖掘地面安装的。 地板(110)安装在挖掘的地面上。 使用锚(190)将桩固定到邻接的地面。 保持支撑件连接到桩上,并支撑安装在挖掘的地面上的篱笆(170)。