-
1.
公开(公告)号:WO2021207390A1
公开(公告)日:2021-10-14
申请号:PCT/US2021/026226
申请日:2021-04-07
Applicant: SAMTEC, INC.
Inventor: BEST, Burrell G. , VICICH, Brian R. , MEREDITH, Kevin R. , FAITH, Chadrick P. , NOVAK, Istvan , BUCK, Jonathan E.
IPC: H05K7/14 , H05K3/34 , H01R12/71 , H01R13/53 , H01R13/658
Abstract: A substrate reinforcement or stiffener can be toolless, slide-on, slide-off, and removable. A hold down can carry pre-attached solder balls, solder units, or fusible elements. Fusible elements can be shaped to reduce thermal and mechanical stresses when reflowed onto a substrate. A heat-producing article can include a heat-dissipation material selectively located on, or immediately adjacent to, a heat-producing article. Clips with a plurality of fingers can be added to power conductors. Graphene strips, graphene coatings, or nanomaterials can be applied to electrically non-conductive articles and are able to selectively direct unwanted heat away from the heat-producing article. Electro-magnetic interference can be reduced by selective placement of voids in a shield of an electrical component.
-
公开(公告)号:WO2014084936A1
公开(公告)日:2014-06-05
申请号:PCT/US2013/056334
申请日:2013-08-23
Applicant: SAMTEC, INC.
Inventor: MONGOLD, John Allen , MUSSER, Randall Eugene , VICICH, Brian R.
IPC: H01R12/71 , H01R13/631
CPC classification number: H01R12/73 , H01R12/7052 , H01R12/716
Abstract: A mezzanine connector includes a first connector including a pass-through hole and a first plurality of contacts arranged around the pass-through hole, the first connector arranged to be connected to a first substrate such that the first plurality of contacts are connected to the first substrate, and a second connector including a beam and a second plurality of contacts arranged around the beam, the second connector arranged to be connected to a second substrate such that the second plurality of contacts are connected to the second substrate. The pass-through hole extends fully through the first connector in a mating direction of the first connector and the second connector, and the beam of the second connector is arranged to extend into the pass-through hole of the first connector when the first connector and the second connector are mated.
Abstract translation: 夹层连接器包括第一连接器,其包括通孔和布置在通孔周围的第一多个触点,第一连接器布置成连接到第一基板,使得第一多个触点连接到第一 基板,以及包括梁和围绕梁布置的第二多个触点的第二连接器,第二连接器布置成连接到第二基板,使得第二多个触点连接到第二基板。 所述通孔在所述第一连接器和所述第二连接器的配合方向上完全延伸穿过所述第一连接器,并且所述第二连接器的所述梁被布置成当所述第一连接器和所述第二连接器的所述第一连接器 第二个连接器配合。
-
3.
公开(公告)号:WO2014133606A1
公开(公告)日:2014-09-04
申请号:PCT/US2013/069982
申请日:2013-11-14
Applicant: SAMTEC, INC.
IPC: H01R13/11
CPC classification number: H01R13/02 , H01R9/091 , H01R12/57 , H01R12/716 , H01R13/11 , H01R13/41 , H01R13/428
Abstract: A contact includes a head, a tail including an opening, a body connected at one end thereof to the head and at another end thereof to the tail, a first lance and a second lance extending from the body, a dimple raised from the body, and a solder member attached to the tail such that the solder member engages at least a portion of the opening. The first lance and the second lance are arranged to deflect when the contact is inserted into a connector; and the first lance, the second lance, and the dimple are arranged to frictionally secure the contact to the connector.
Abstract translation: 触点包括头部,包括开口的尾部,在其一端连接到头部并且在其另一端连接到尾部的主体,从主体延伸的第一枪和第二枪,从主体升起的凹坑, 以及附接到尾部的焊料构件,使得焊料构件与开口的至少一部分接合。 第一喷枪和第二喷枪布置成当接触件插入连接器时偏转; 并且第一长矛,第二长矛和凹坑被布置成将触点摩擦地固定到连接器。
-
-