CONTROL VARIABLE DETERMINATION TO MAXIMIZE A DRILLING RATE OF PENETRATION
    1.
    发明申请
    CONTROL VARIABLE DETERMINATION TO MAXIMIZE A DRILLING RATE OF PENETRATION 审中-公开
    控制可变的确定以最大限度地提高钻孔的钻孔速度

    公开(公告)号:WO2015042347A1

    公开(公告)日:2015-03-26

    申请号:PCT/US2014/056455

    申请日:2014-09-19

    Abstract: A method of determining an optimal value for a control of a drilling operation is provided. Drilling data from a drilling operation is received. The drilling data includes a plurality of values measured for each of a plurality of drilling control variables during the drilling operation. An objective function model is determined using the received drilling data. The objective function model maximizes a rate of penetration for the drilling operation. Measured drilling data is received that includes current drilling data values for a different drilling operation. An optimal value for a control of the different drilling operation is determined by executing the determined objective function model with the measured drilling data that includes the current drilling data values for the different drilling operation as an input. The determined optimal value for the control of the different drilling operation is output.

    Abstract translation: 提供了一种确定钻井操作控制的最佳值的方法。 接收钻井作业的钻井数据。 钻井数据包括在钻井操作期间为多个钻井控制变量中的每一个测量的多个值。 使用接收的钻井数据确定目标函数模型。 目标函数模型最大限度地提高了钻井作业的渗透率。 接收到的测量钻井数据包括不同钻井作业的当前钻井数据值。 通过执行所确定的目标函数模型来确定用于不同钻井操作的控制的最佳值,其中所测量的钻井数据包括用于不同钻井操作的当前钻井数据值作为输入。 输出用于控制不同钻孔操作的确定的最佳值。

Patent Agency Ranking