FLUID FLOW BACK PREDICTION
    1.
    发明申请
    FLUID FLOW BACK PREDICTION 审中-公开
    流体流量预测

    公开(公告)号:WO2015061255A1

    公开(公告)日:2015-04-30

    申请号:PCT/US2014/061479

    申请日:2014-10-21

    CPC classification number: E21B44/00 E21B21/08 E21B47/042 E21B49/003 G06F17/50

    Abstract: A computing device configured to determine when an alarm is triggered for a drilling operation is provided. Measured drilling data that includes a value measured for an input variable during a previous connection event of a drilling operation is received. A predicted value for a fluid flow back measure is determined by executing a predictive model with the measured drilling data as an input. The predictive model is determined using previous drilling data that includes a plurality of values measured for the input variable during a second drilling operation. The second drilling operation is a previous drilling operation at a different geographic wellbore location than the drilling operation. A fluid flow back measurement datum determined from sensor data is compared to the determined predicted value for the fluid flow back measure. An alarm is triggered on the drilling operation based on the comparison.

    Abstract translation: 提供了一种被配置为确定何时触发钻孔操作的计算装置。 接收在钻孔操作的先前连接事件期间包括对输入变量测量的值的测量钻孔数据。 通过执行具有测量的钻井数据作为输入的预测模型来确定流体回流测量的预测值。 使用包括在第二次钻孔操作期间为输入变量测量的多个值的先前钻孔数据确定预测模型。 第二次钻井作业是在与钻井作业不同的地理井筒位置的先前的钻井作业。 将从传感器数据确定的流体回流测量数据与流体回流测量的确定的预测值进行比较。 基于比较,钻孔操作触发报警。

    CONTROL VARIABLE DETERMINATION TO MAXIMIZE A DRILLING RATE OF PENETRATION
    2.
    发明申请
    CONTROL VARIABLE DETERMINATION TO MAXIMIZE A DRILLING RATE OF PENETRATION 审中-公开
    控制可变的确定以最大限度地提高钻孔的钻孔速度

    公开(公告)号:WO2015042347A1

    公开(公告)日:2015-03-26

    申请号:PCT/US2014/056455

    申请日:2014-09-19

    Abstract: A method of determining an optimal value for a control of a drilling operation is provided. Drilling data from a drilling operation is received. The drilling data includes a plurality of values measured for each of a plurality of drilling control variables during the drilling operation. An objective function model is determined using the received drilling data. The objective function model maximizes a rate of penetration for the drilling operation. Measured drilling data is received that includes current drilling data values for a different drilling operation. An optimal value for a control of the different drilling operation is determined by executing the determined objective function model with the measured drilling data that includes the current drilling data values for the different drilling operation as an input. The determined optimal value for the control of the different drilling operation is output.

    Abstract translation: 提供了一种确定钻井操作控制的最佳值的方法。 接收钻井作业的钻井数据。 钻井数据包括在钻井操作期间为多个钻井控制变量中的每一个测量的多个值。 使用接收的钻井数据确定目标函数模型。 目标函数模型最大限度地提高了钻井作业的渗透率。 接收到的测量钻井数据包括不同钻井作业的当前钻井数据值。 通过执行所确定的目标函数模型来确定用于不同钻井操作的控制的最佳值,其中所测量的钻井数据包括用于不同钻井操作的当前钻井数据值作为输入。 输出用于控制不同钻孔操作的确定的最佳值。

Patent Agency Ranking