公开(公告)号:JPH07296062A
公开(公告)日:1995-11-10
申请号:JP10769394
申请日:1994-04-22
Applicant: SONY CORP
Inventor: INAMURA AKIO , OSHIRO KENICHIRO , KATO TOSHIRO
Abstract: PURPOSE:To provide a method for supporting the decision of staff arrangement, which can easily decide the arrangement of staffs within a working section. CONSTITUTION:First, an analyzer 1 executes data input 1a, data base storage 2a and transfer-processing 2b to a high-order device 3 outside of the working section concerning the working situation of the staffs by a terminal equipment 2 on the side of the working section. Next, after the generation 3a of a simulation model from this piece of data by the high-order device 3 and the execution of simulation 3b, the result of simulation is displayed 2c to the terminal equipment 2. Then, the analyzer 1 refers to this so as to decide the arrangement of the staffs. Besides, a flag showing whether the work of the staffs is directly related or not to production is added to the data base in advance so as to execute loss analysis lb with regard to the work of the staffs in the method for supporting the decision of staff arrangement.
-
公开(公告)号:JPH07282148A
公开(公告)日:1995-10-27
申请号:JP10082094
申请日:1994-04-13
Applicant: SONY CORP
Inventor: YOSHIDA TAKESHI , INAMURA AKIO , KATO TOSHIRO
Abstract: PURPOSE:To provide a production management method capable of shortening the manufacture lead time and maintaining the maximum throughput. CONSTITUTION:A reference processing amount, a management limit value, a process restoration margin and a reference completed amount are set for respective processes beforehand and a real processing amount A and the management limit value B are compared every time when a prescribed time elapses (a step 1b). When the process for which the real processing amount A exceeds the management limit value B in the comparison is present, the message for warning is displayed at respective work instruction devices (the steps 1d and 1d') and further, when a completed amount result summed-up total D in the process is less than a reference completed amount summed-up total C, the processing amount is increased by using the process restoration margin. Also, when the completed amount result summed-up total D is more than the reference completed amount summed-up total C, informing for limiting the processing amount of a previous process is performed.
-