ARTIFICIAL INTELLIGENCE AUGMENTATION OF GEOGRAPHIC DATA LAYERS

    公开(公告)号:US20240362836A1

    公开(公告)日:2024-10-31

    申请号:US18645254

    申请日:2024-04-24

    CPC classification number: G06T11/203 G06T7/13 G06T11/40

    Abstract: A method for gap filling geographic information service data includes determining a bounding region at or near an initial alignment. The method also includes determining the initial alignment within the bounding region. A corridor buffer is generated at or near the initial alignment, and within the bounding region. Cost layer data is processed. Incompleteness of a number of polygon-bounded areas is determined based on the cost layer data. Partial completeness of the polygon-bounded areas and completeness of the polygon-bounded areas are also determined based on the cost layer data. A synthetic completeness of the number of polygon-bounded areas is generated based on the incompleteness, the partial completeness, synthetic completeness, and completeness of the polygon-based areas. A rasterized cost map including the completeness and the synthetic completeness of the polygon-bounded areas is stored at the processor(s) and in memory (ies).

    DYNAMIC CONTROL POINTS FOR INFRASTRUCTURE DESIGN AND SIMULATION

    公开(公告)号:US20240362374A1

    公开(公告)日:2024-10-31

    申请号:US18645266

    申请日:2024-04-24

    CPC classification number: G06F30/20

    Abstract: A method for generating a dynamic control point for generating an optimized curve includes determining, at a processor(s), an initial curve. A control point sampling interval and a condition are set by the processor(s). Multiple static control points are determined. The static control points are sampled based on the control point sampling interval. A sampled static control point is selected from the plurality of static control points based on the sampled static control point satisfying the condition. The sampled static control point is stored in a set of filtered control points. The set of filtered control points is sampled. A sampled filtered control point is selected based on the control point sampling interval. A dynamic control point is generated based on the sampled filtered control point.

    SMART INFRASTRUCTURE
    6.
    发明申请

    公开(公告)号:US20220138366A1

    公开(公告)日:2022-05-05

    申请号:US17513726

    申请日:2021-10-28

    Abstract: A system for design and implementation of a project that includes a plurality of design and testing tools directed to phases of the project's lifecycle. The plurality of design and testing tools is usable for physical horizontal and vertical infrastructure and the physical and vertical infrastructure of the project is constructed based upon a project design created and tested from the plurality of design and testing tools.

Patent Agency Ranking