Controlling scheduling of a GPU
    1.
    发明授权

    公开(公告)号:US11847492B2

    公开(公告)日:2023-12-19

    申请号:US16063518

    申请日:2016-12-09

    CPC classification number: G06F9/4887 G06F9/4881 G06T1/20 Y02D10/00

    Abstract: The operation of a GPU is controlled based on one or more deadlines by which one or more GPU tasks must be completed and estimates of the time required to complete the execution of a first GPU task (which is currently being executed) and the time required to execute one or more other GPU tasks (which are not currently being executed). Based on a comparison between the deadline(s) and the estimates, context switching may or may not be triggered.

    Controlling operation of a GPU
    2.
    发明授权

    公开(公告)号:US11853796B2

    公开(公告)日:2023-12-26

    申请号:US16063618

    申请日:2016-12-09

    CPC classification number: G06F9/4887 G06F9/4818 G06F9/4881 G06T1/20

    Abstract: The operation of a GPU is controlled based on one or more deadlines by which one or more GPU tasks must be completed and estimates of the time required to complete the execution of a first GPU task (which is currently being executed) and the time required to execute one or more other GPU tasks (which are not currently being executed). Based on a comparison between the deadline(s) and the estimates, the operating parameters of the GPU may be changed.

Patent Agency Ranking