公开(公告)号:US20240414892A1
公开(公告)日:2024-12-12
申请号:US18206523
申请日:2023-06-06
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Eric C. PETERSON , Winston Allen SAUNDERS , Sean Patrick ABBOTT , Mark Alan MONROE , Sean Michael JAMES , Kristofer Andrew JOHNSON , Christian L. BELADY , Anthony Joseph BIANCHI
Abstract: A system may include a datacenter supervisory control system (SCS). A system may include at least one datacenter sensor in data communication with the SCS to communicate a datacenter state variable to the SCS. A system may include at least one environmental sensor in data communication with the SCS to communicate an environmental state variable to the SCS. A system may include a water aware controller in data communication with the SCS, wherein the water aware controller includes a predictor that receives a datacenter state input based on the datacenter state variable, the environmental state input based on the environmental state variable, and at least one user objective function, and the water aware controller transmits a selected action to the SCS to meet a setpoint based on the datacenter state input and the environmental state input.
-
公开(公告)号:US20240334657A1
公开(公告)日:2024-10-03
申请号:US18126866
申请日:2023-03-27
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Eric C. PETERSON , Winston Allen SAUNDERS , Sean Patrick ABBOTT , Mark Alan MONROE , Kristofer Andrew JOHNSON , Christian L. BELADY , Anthony Joseph BIANCHI
IPC: H05K7/20
CPC classification number: H05K7/20836 , H05K7/20745
Abstract: A thermal management system includes an air handling unit (AHU) configured to receive outside air (OA) from an OA intake, and water from a water source, where the AHU is configured to direct conditioned air toward a cold aisle and the AHU includes a modular adiabatic layer containing an evaporative media, and the modular adiabatic layer includes a plurality of subregions configured to be wetted by the evaporative media independently of one another.
-
公开(公告)号:US20240107716A1
公开(公告)日:2024-03-28
申请号:US17953834
申请日:2022-09-27
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Bharath RAMAKRISHNAN , Nicholas Andrew KEEHN , Husam Atallah ALISSA , Ruslan NAGIMOV , Eric C. PETERSON
IPC: H05K7/20 , H01M10/44 , H01M10/613 , H01M10/63 , H01M10/6567
CPC classification number: H05K7/20836 , H01M10/44 , H01M10/613 , H01M10/63 , H01M10/6567 , H05K7/203 , H05K7/20318 , H05K7/20327 , H05K7/20818 , H01M2220/10
Abstract: A thermal management system includes a high-pressure (HP) container, a low-pressure (LP) container in fluid communication with the HP container and having a fluid pressure less than the HP container, and a two-phase working fluid partially in the HP container and partially in the LP container. The two-phase working fluid has a vapor phase and a liquid phase. A pump is configured to move the working fluid through the system, and a condenser is configured to condense the vapor phase of the working fluid into the liquid phase.
-
公开(公告)号:US20250169023A1
公开(公告)日:2025-05-22
申请号:US18518016
申请日:2023-11-22
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Ruslan NAGIMOV , Christian L. BELADY
IPC: H05K7/14
Abstract: A system may include a grid connection configured to receive grid electrical power at a grid voltage, a grid amperage, and a grid frequency. A system may include a co-location including a plurality of computing devices. A system may include a solid-state transformer in electrical communication with the grid connection and configured to convert the grid electrical power to co-location electrical power having a co-location voltage different from the grid voltage and a co-location amperage different from the grid amperage. A system may include a superconducting cable providing electrical communication of the co-location electrical power from the solid-state transformer to the co-location.
-
公开(公告)号:US20230418347A1
公开(公告)日:2023-12-28
申请号:US17849054
申请日:2022-06-24
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Alok Gautam KUMBHARE , Mark Alan MONROE , Osvaldo P. MORALES , Christian L. BELADY , Kyle WOOLCOCK , Ricardo Gouvêa BIANCHINI , Winston Allen SAUNDERS , Lalu Vannankandy KUNNATH , Rodrigo Lemos de ASSIS , Brijesh WARRIER , Marcus Felipe FONTOURA , Sean Patrick ABBOTT , David Thomas GAUTHIER , Ashish RANIWALA , Nithish MAHALINGAM , Brian Addams JANOUS , Upshur Bagwell QUINBY, V
IPC: G06F1/26 , G05B19/042
CPC classification number: G06F1/26 , G05B19/042 , G05B2219/2639
Abstract: A power controller allocates input power to a datacenter between computing power for computing services, backup power, and overhead power for overhead systems. The power controller reallocates the overhead power and/or the backup power to the computing power. This may increase the overall utilization of the datacenter by allowing additional processing power of the servers to be used.
-
公开(公告)号:US20250132568A1
公开(公告)日:2025-04-24
申请号:US18493669
申请日:2023-10-24
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Scot Edward HEATH , Shaun L. HARRIS , Paul Andrew CHURNOCK , Sean JAMES , Christian L. BELADY
Abstract: Power draw stabilization is provided. A target power consumption of a source load is determined. The source load is generated by electronics supplied power by a primary power source through a power rail. The power rail is coupled to a capacitor bank by a bi-directional converter configured to smooth fluctuations in power drawn from the primary power source by performing mode switch operations. The mode switch operations include, in response to the source load exceeding a target power consumption, controllably switching to a second directional mode that directs current released from the capacitor bank to the power rail. The mode switch operations further include, in response to the source load dropping below the target power consumption, controllably switching the operational mode of the bi-directional converter to a first directional mode to direct current from the power rail into the capacitor bank.
-
公开(公告)号:US20240372389A1
公开(公告)日:2024-11-07
申请号:US18311119
申请日:2023-05-02
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Christian L. BELADY , Sean Michael JAMES
IPC: H02J7/00 , G05B19/042 , H02J13/00
Abstract: A system may include a first energy storage system (ESS) configured to provide electrical power to a datacenter. A system may include a second ESS configured to provide electrical power to the datacenter, wherein the second ESS is a higher-level ESS relative to the first ESS. A system may include a hierarchical ESS controller in data communication with the first ESS, the second ESS, and the datacenter and configured to: obtain grid information from a regional power grid, obtain first ESS state information, obtain second ESS state information, obtain datacenter power demands, determine a discharge schedule of the first ESS and the second ESS for the datacenter based at least partially on the grid information and the datacenter power demands, and discharge at least one of the first ESS and the second ESS based on the discharge schedule.
-
公开(公告)号:US20220352750A1
公开(公告)日:2022-11-03
申请号:US17245196
申请日:2021-04-30
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ruslan NAGIMOV , Ehsan NASR AZADANI
Abstract: Integrated energy storage system including a thermal energy storage coupled with a liquid metal battery storage and a cryogenic energy storage and related methods are described. An example integrated energy storage system includes a liquid metal battery storage, a cryogenic energy storage configured to store energy using a liquefied cryogen, a thermal energy storage, and a control system. The control system is configured to cause selective transfer of heat from the thermal energy storage to at least one battery unit associated with the liquid metal battery storage. The control system is configured to during a first mode associated with the cryogenic energy storage, cause selective transfer of heat from the cryogenic energy storage to the thermal energy storage. The control system is configured to during a second mode associated with the cryogenic energy storage, cause selective transfer of heat from the thermal energy storage to the cryogenic energy storage.
-
公开(公告)号:US20240332971A1
公开(公告)日:2024-10-03
申请号:US18203491
申请日:2023-05-30
Applicant: Microsoft Technology Licensing, LLC
Inventor: Ehsan NASR AZADANI , Christian L. BELADY , Paul Andrew CHURNOCK , Sean Michael JAMES
IPC: H02J3/14
CPC classification number: H02J3/144 , H02J2300/20
Abstract: A system for providing power to a datacenter includes an information technology (IT) load, a grid connection, a grid information source, a discretely refuellable energy source, and an energy controller. The grid connection provides electrical communication between the IT load and a power grid. The grid information source is in communication with the grid connection and configured to obtain grid information. The discretely refuellable energy source is in electrical communication with the IT load. The energy controller is in data communication with the grid information source and configured to discharge the discretely refuellable energy source to the IT load based at least partially on the grid information.
-
公开(公告)号:US20240268056A1
公开(公告)日:2024-08-08
申请号:US18196925
申请日:2023-05-12
Applicant: Microsoft Technology Licensing, LLC
Inventor: Afshin MAJD , Ryan Douglas CARVER , Ehsan NASR AZADANI , Lalu Vannankandy KUNNATH
IPC: H05K7/14 , G05B19/042
CPC classification number: H05K7/1492 , G05B19/042 , G05B2219/2639
Abstract: Techniques for providing auxiliary power to a datacenter, which is normally serviced by a power utility, are disclosed. The system includes a controller, a first stamp, and a second stamp. A common DC bus couples the first stamp to the second stamp on a DC side. A common AC bus couples the first stamp to the second stamp on an AC side (e.g., the output of the stamps). An AC breaker is disposed on the AC bus between the first stamp and the second stamp. The controller controls whether the AC breaker is open or closed. A default state of the AC breaker is an open state. The control of the breakers can occur for various reasons, including whether the utility is available or whether the utility is not available. The utility might not be available due to a utility failure or due to other reasons.
-
-
-
-
-
-
-
-
-