Abstract:
This invention relates to a method and a power plant controller arranged to carry out the method. The method is on an intelligent dispatching of the power production to wind turbines and optional compensation equipment of a wind power plant, as the power producing units of a wind power plant. The invention relates to a case where the requested produced power is less than the total capacity of the power plant, and the invention relates to utilizing this situation to dispatch set points to the wind turbines and the compensation equipment in a flexible way. This flexibility may increase the wind turbines' life time, help in scheduling maintenance and expand the electrical operating range of the wind power plant. The determination of the set points on active and reactive power is a combined determination of both set points for each of the energy producing units of the wind power plant.
Abstract:
The present invention relates to a method for controlling a wind power plant, the wind power plant comprising a plurality of wind turbine generators, each wind turbine generator comprising at least one power converter for providing active power and/or reactive power to an electrical grid, wherein the method is determining a required amount of reactive power provided by the plurality of wind turbine generators, and grouping the plurality of wind turbine generators into a first set of wind turbine generators and a second set of wind turbine generators based on a demand for reactive power; and supplying reactive power to the grid (20) from the first set of wind turbine generators and disconnecting the second set of wind turbine generators from the electrical grid (20) in response to a control demand, in order to minimize active power losses. The present invention also relates to a wind power plant arranged to perform the method.
Abstract:
This invention relates to a method and a power plant controller arranged to carry out the method. The method is on an intelligent dispatching of the power production to wind turbines and optional compensation equipment of a wind power plant, as the power producing units of a wind power plant. The invention relates to a case where the requested produced power (both active and reactive) is less than the total capacity of the power plant, and the invention relates to utilizing this situation to dispatch set points to the wind turbines and the compensation equipment based on correction factors relating to the operating conditions of the wind park. This method may increase the wind turbines' life time, help in scheduling maintenance and expand the electrical operating range of the wind power plant.