DYNAMIC CONTROL OF REACTIVE POWER LIMITS OF WIND POWER PLANT

    公开(公告)号:WO2022128028A1

    公开(公告)日:2022-06-23

    申请号:PCT/DK2021/050353

    申请日:2021-12-06

    Abstract: The disclosure relates to a method of operating a wind power plant, and related power plant controller and wind power plant. The method comprises determining a first active power at a first operating point and applying a first limit value for a reactive power limit. The method further comprises determining a second active power at a second operating point. The method further comprises, responsive to determining that the second active power meets one or more active power conditions referenced to the first active power, applying a second limit value for the reactive power limit. Applying the second limit value comprises limiting a ramp rate of the reactive power limit. The method further comprises generating control signals for one or more wind turbines to control a collective reactive power output of the wind power plant in accordance with the reactive power limit.

    IMPROVEMENTS RELATING TO THE INTERCONNECTION OF MULTIPLE RENEWABLE ENERGY POWER PLANTS
    2.
    发明申请
    IMPROVEMENTS RELATING TO THE INTERCONNECTION OF MULTIPLE RENEWABLE ENERGY POWER PLANTS 审中-公开
    关于多个可再生能源电厂相互连接的改进

    公开(公告)号:WO2017167335A1

    公开(公告)日:2017-10-05

    申请号:PCT/DK2017/050074

    申请日:2017-03-15

    Abstract: A method of controlling a first renewable energy power plant, comprising: determining power delivery of the first renewable energy power plant to a collector bus;receiving data relating to power delivery from a second renewable energy power plant connected to the collector bus;determining the combined power delivery of the first and second renewable energy power plants to the collector bus;estimating the transmission line power loss on a first transmission line between the collector bus and a power grid point of interconnection (POI) based on the combined power delivery; and regulating the power delivery from the first renewable energy power plant to compensate for the estimated transmission line power loss. Aspects of the invention also relate to a computer program product downloadable from a communication network and/or stored on a machine readable medium, comprising program code instructions for implementing a method as defined above, and to a power plant controller.

    Abstract translation: 控制第一可再生能源发电厂的方法,包括:确定第一可再生能源发电厂向收集器总线的功率输送;接收与来自第二可再生能源发电厂的功率输送有关的数据 ;确定所述第一和第二可再生能源发电厂到所述收集器总线的组合动力输送;估计所述收集器总线和电力网互连点(POI)之间的第一传输线上的所述传输线功率损失 在联合电力传输; 并且调节来自第一可再生能源发电厂的电力输送以补偿估计的输电线路功率损耗。 本发明的各方面还涉及可从通信网络下载和/或存储在机器可读介质上的计算机程序产品,包括用于实现如上定义的方法的程序代码指令以及发电厂控制器。

    METHODS AND SYSTEMS FOR ENHANCED ACTIVE POWER CONTROL DURING FREQUENCY DEVIATION

    公开(公告)号:WO2022156866A1

    公开(公告)日:2022-07-28

    申请号:PCT/DK2022/050001

    申请日:2022-01-03

    Abstract: Aspects of the present invention relate to a method (200) for controlling active power output of a renewable energy power plant (12) comprising one or more renewable energy generators (14). The method (200) comprises: while a measured frequency level of a power network (16) to which the power plant (12) is connected is within a frequency deadband: determining an estimated active power output from the power plant (12) according to a model (101) of the power plant (12) and one or more model inputs; and determining a measured active power output from the power plant (12); and when the frequency level of the power network (22) is outside the frequency deadband: determining an estimate of available active power for the power plant (12) to supply according to the model (101) of the power plant (12) and one or more model inputs; determining an estimate correction factor based on a comparison of the estimated active power output with respect to the measured active power output; correcting the estimate of available active power based on the estimate correction factor to provide a corrected estimate of available active power; and determining and dispatching active power set points for controlling the one or more renewable generators (14) of the power plant (12), the set points being determined based on the corrected estimate of available active power and the frequency level. Aspects of the invention may be used to control the active power output of a wind energy power plant (12) and to determine accurate estimates of the available active power when the frequency level of the connected power network (16) is outside of the frequency deadband.

    CONTROLLING A POWER PLANT COMPRISING WIND TURBINES DURING GRID FREQUENCY DEVIATION

    公开(公告)号:WO2022100802A1

    公开(公告)日:2022-05-19

    申请号:PCT/DK2021/050311

    申请日:2021-10-19

    Abstract: The invention relates to a method for controlling a power plant during an event which requires a change of the power produced by the power plant, wherein the power plant comprises a plurality of power generating units including at least one wind turbine generator, the method comprises determining the power reference dependent on an available power (Pava), changing the power reference to a modified power reference (Pref_mod) by a power variation (ΔP) in response to detecting a first event, memorizing a power level relating to the actual power production at a time occurrence of the first event, setting a maximum power limit (Pmax) to the memorized power level, limiting the modified power reference (Pref_mod) to the maximum power limit (Pmax), and controlling the power produced by the wind turbines in accordance with the limited modified power reference.

    METHODS AND SYSTEMS FOR CONTROLLING A WIND TURBINE GENERATOR IN RESPONSE TO A FREQUENCY DEVIATION

    公开(公告)号:WO2022089702A1

    公开(公告)日:2022-05-05

    申请号:PCT/DK2021/050315

    申请日:2021-10-25

    Abstract: Aspects of the present invention relate to methods (200, 300) for controlling active power output of a wind turbine generator (14) in response to a frequency event on a power network (16) to which the wind turbine generator (14) is connected, wherein the active power output of the wind turbine generator (14) is limited to be below an upper active power limit and/or above a lower active power limit. The methods (200, 300) comprise determining and dispatching active power references to a controller (15) of the wind turbine generator (14) for controlling the wind turbine generator (14). The methods operate to ensure that the value of the active power reference immediately after the frequency event is within the allowable active power range, thereby avoiding any mismatch between the reference and the output that may cause a delay in returning to normal operation.

    WIND POWER PLANT CONTROLLER
    7.
    发明申请
    WIND POWER PLANT CONTROLLER 审中-公开
    风力发电厂控制器

    公开(公告)号:WO2014194914A1

    公开(公告)日:2014-12-11

    申请号:PCT/DK2014/050139

    申请日:2014-05-21

    Abstract: The present invention relates a power plant controller (PPC), the power plant controller to control produced power from a wind power plant (WPP), the wind power plant comprises at least a plurality of wind turbine generators,the wind power plant being connected to an electrical grid, wherein the power plant controller,in the event of receiving a signal indicative of a predefined event in the wind power plant, is capable of controlling the wind power plant so that the produced power, from the wind power plant to the electric grid, is a negative amount of active power. The invention also relates to a method for controlling a wind power plant connected to an electrical grid, the wind power plant comprises a plurality of wind turbine generators.

    Abstract translation: 本发明涉及一种发电厂控制器(PPC),该发电厂控制器用于控制来自风力发电厂(WPP)的产生的电力,该风力发电厂至少包括多个风力涡轮发电机,风力发电厂连接到 电网,其中在接收到指示风力发电厂中的预定事件的信号的情况下,发电厂控制器能够控制风力发电厂,使得从风力发电厂到电力的生产的电力 电网,是有功功率的负数。 本发明还涉及一种用于控制连接到电网的风力发电厂的方法,所述风力发电厂包括多个风力涡轮发电机。

    WIND POWER PLANT CONTROLLER
    9.
    发明公开
    WIND POWER PLANT CONTROLLER 审中-公开
    WINDKRAFTANLAGENSTEUERUNG

    公开(公告)号:EP3004634A1

    公开(公告)日:2016-04-13

    申请号:EP14725958.4

    申请日:2014-05-21

    Abstract: The present invention relates a power plant controller (PPC), the power plant controller to control produced power from a wind power plant (WPP), the wind power plant comprises at least a plurality of wind turbine generators, the wind power plant being connected to an electrical grid, wherein the power plant controller, in the event of receiving a signal indicative of a predefined event in the wind power plant, is capable of controlling the wind power plant so that the produced power, from the wind power plant to the electric grid, is a negative amount of active power. The invention also relates to a method for controlling a wind power plant connected to an electrical grid, the wind power plant comprises a plurality of wind turbine generators.

    Abstract translation: 本发明涉及一种发电厂控制器(PPC),该发电厂控制器用于控制来自风力发电厂(WPP)的发电,该风力发电厂至少包括多个风力发电机组,该风力发电厂连接至 电网,其中在接收到指示风力发电厂中的预定事件的信号的情况下,发电厂控制器能够控制风力发电厂,使得从风力发电厂到电力的生产的电力 电网,是有功功率的负数。 本发明还涉及一种用于控制连接到电网的风力发电厂的方法,所述风力发电厂包括多个风力涡轮发电机。