公开(公告)号:JP2012202093A
公开(公告)日:2012-10-22
申请号:JP2011067048
申请日:2011-03-25
Applicant: Ohbayashi Corp , Toko:Kk , 株式会社大林組 , 株式会社東宏
Inventor: ISHIYAMA TOMONOBU , KOBAYASHI MAKOTO , NAKAMURA AKIRA , KOBAYASHI MASAHIKO
Abstract: PROBLEM TO BE SOLVED: To provide a face containment method for exhausting polluted air while inhibiting the polluted air generated near a face during constructing a tunnel from spreading into the whole tunnel.SOLUTION: The face containment method for preventing the spread of polluted air during constructing the tunnel where an exhaust pipe is installed comprises the steps of: forming a partition wall in a predetermined range from the ceiling wall face and the inner wall side face of the tunnel; providing one end of the exhaust pipe on the further face side than the partition wall; and using the exhaust pipe for collecting the polluted air from a space between the partition wall and the face, whereby causing air to flow from the pit mouth side to the face side to prevent the spread of the polluted air.
Abstract translation: 要解决的问题:提供一种用于排放污染空气的面部容纳方法,同时在构造隧道期间在面部附近产生的污染空气扩散到整个隧道中。 解决方案:在安装排气管的隧道施工期间防止污染空气扩散的面包容法包括以下步骤:在顶壁面和内壁侧面形成预定范围内的隔壁 的隧道; 将排气管的一端设置在比隔壁的另一面侧; 并且使用排气管从分隔壁和面之间的空间收集被污染的空气,从而使空气从坑口侧流到面侧以防止污染空气的扩散。 版权所有(C)2013,JPO&INPIT
-
-
-
公开(公告)号:JP2005083132A
公开(公告)日:2005-03-31
申请号:JP2003318654
申请日:2003-09-10
Applicant: Nishimatsu Constr Co Ltd , Toko:Kk , 株式会社東宏 , 西松建設株式会社
Inventor: ABE TOSHIO , ONO TOSHIAKI , NAGAYAMA TOMOYUKI , SONODA TAKESHI , KOBAYASHI MASAHIKO
IPC: E21D20/00
Abstract: PROBLEM TO BE SOLVED: To provide a setting material injection pipe which is for use in injection work of a setting material into a lock bolt hole, wherein the setting material injection pipe can prevent infiltration of sand gravel therein when the setting material injection pipe is inserted into the lock bolt hole and does not hinder effusion of the setting material at the time of injection of the same.
SOLUTION: The setting material injection pipe 1 is provided with a cap 2 which is attached to a tip aperture 4 formed therein, so as to be detached from the tip aperture 4 due to injection pressure of the setting material to open the tip aperture 4. The setting material injection pipe 1 is made to be a taper state toward the tip thereof, and the tip aperture 4 has a groove 6 formed therein, for fitting into a bottom 5 of the cap 2, whereby entering of sand gravel into the injection pipe due to contact of the injection pipe with a hole wall, can be reduced.
COPYRIGHT: (C)2005,JPO&NCIPIAbstract translation: 要解决的问题:提供一种用于将固化材料注入到锁定螺栓孔中的固化材料注入管,其中当固化材料注入时,固化材料注入管可以防止其中的砂砾渗透 管被插入锁定螺栓孔中,并且在注射时不会妨碍固化材料的渗出。
解决方案:固化材料注入管1设置有盖2,盖2附接到形成在其中的尖端孔4,以便由于固定材料的注射压力而从尖端孔4分离以打开尖端 孔4将固化材料注入管1制成朝向其尖端的锥形状态,并且尖端孔4具有形成在其中的槽6,用于装配到盖2的底部5中,从而将砂砾进入 注射管由于注入管与孔壁的接触而减少。 版权所有(C)2005,JPO&NCIPI
-
-
-
公开(公告)号:JP2021059932A
公开(公告)日:2021-04-15
申请号:JP2019185824
申请日:2019-10-09
Abstract: 【課題】供用中のトンネルであっても、車両などの通行体を安全に通行させながら施工できるトンネル改修工法及び型枠装置を提供することを目的とする。 【解決手段】トンネル用の改修装置10の型枠部22を、供用中のトンネル1のコンクリート覆工2に対する内部側に所定間隔を隔てて配置し、打設空間4にコンクリートを打設して、トンネル1内面を改修するトンネル改修工法であって、トンネル1における施工側半断面X(あるいは通行側半断面Y)に対して、半断面のコンクリート覆工2に対応する弧状に形成された型枠部22を配置するとともに、通行側半断面Y(あるいは施工側半断面X)に、通行車両Zが通行空間30Xを通行できるプロテクタ30を配置する。 【選択図】図1
-
公开(公告)号:JP6765559B1
公开(公告)日:2020-10-07
申请号:JP2020049095
申请日:2020-03-19
Applicant: 株式会社東宏
Inventor: 小林 雅彦
Abstract: 【課題】クラッシャの稼働率を最適化可能な岩塊サイズを最適化する、岩塊サイズの最適化システム、最適化方法、プログラム、及び記録媒体を提供する。 【解決手段】岩塊サイズの最適化システム1は、クラッシャAへ投入する前の岩塊に係る岩塊情報を取得する、岩塊情報取得手段10と、岩塊情報及び稼働率情報から岩種別の最適岩塊サイズを演算する、岩塊サイズ演算手段30と、を備えることを特徴とする。本発明の岩塊サイズの最適化方法は、岩塊情報取得手段10がクラッシャへ投入する前の岩塊に係る岩塊情報を取得するステップと、岩塊サイズ演算手段30が岩塊情報及び稼働率情報から岩種別の最適岩塊サイズを演算するステップと、削孔パターン演算手段40が岩塊情報及び最適岩塊サイズから切羽の発破掘削に係る削孔パターン情報を演算するステップと、を備えることを特徴とする。 【選択図】図1
-
-
公开(公告)号:JP2020084478A
公开(公告)日:2020-06-04
申请号:JP2018217208
申请日:2018-11-20
Applicant: 株式会社東宏
Inventor: 小林 雅彦
Abstract: 【課題】小断面トンネルでも適用可能であり、架台の受け替え作業が不要であり、移動台車における足場上の作業に干渉しないベルトコンベアの配置構造を提供する。 【解決手段】ベルトコンベアの配置構造1は、山岳トンネル工事において、切羽側から坑外側へズリを搬出するベルトコンベア10を坑内に配置する構造であって、坑内の幅方向両側に配した第一支柱31a及び第二支柱31bで支持する移動台車30の、第一支柱31aの直下の路盤上にベルトコンベア10を配置したことを特徴とする。 【選択図】図1
-
-
-
-
-
-
-
-
-