Abstract:
PURPOSE: A method for a total maximum daily load management system for integrated watershed management is provided to improve the total maximum daily load management system for reducing a pollutant water discharge load level below a total pollutant load level which enables the discharge of pollutant water to achieve the target water quality. CONSTITUTION: The standard water flow is calculated by considering both the average storage amount of water for 10 year and the average shortage amount of water for 10 year in a selected target watershed. A discharge pollution load by small watershed is calculated by each pollution source group. The reduction pollutant load except the allowable total amount of the charged pollutant load amount is calculated. The standard discharge pollutant load amount is calculated by using the target water quality level and the standard water flow.
Abstract:
본 발명은 유역통합관리를 위한 수질오염 총량관리방법에 관한 것으로, (a) 대상유역의 오염총량관리 대상물질과 그 목표수질 및 선정된 대상유역의 10년 평균 저수량과 10년 평균 갈수량이 병행 산정된 기준유량이 입력자료로 입력장치에 의해 메인 메모리에 입력 저장되는 단계와; (b) 오염원 그룹별로 산정된 소유역별 배출오염부하량에 의해 산정된 대상유역의 총 배출오염부하량이 입력자료로 입력장치에 의해 메인 메모리에 입력 저장되는 단계와; (c) 중앙처리장치가 상기 단계(a)의 목표수질과 기준유량 및 메인 메모리 내의 HSPF 모형을 이용하여 기준배출 오염부하량을 산정하고, 상기 단계(b)에서의 배출오염부하량에서 허용총량을 제외한 삭감오염부하량을 계산 저장하되, 상기 안전율은 10%의 안전율과 표준오차를 고려한 안전율 및 일정한 수학식이 포함된 메인 메모리 내의 프로그램을 이용해 일정한 수학식을 만족하는 변동성과 불확실성을 고려한 안전율을 병행하여 산정하는 단계, 및 (d) 중앙처리장치가 동일부하삭감방법, 동일비율제거방법과 공평기준을 이용한 방법이 포함된 메인 메모리 내의 프로그램을 이용해 상기 단계(c)에서 산정된 삭감오염부하량을 각 소유역 또는 행정구역별로 할당하는 단계로 구성됨으로써, 수역별 목표수질 달성을 위해 배출할 수 있는 오염부하총량 이내로 배출부하량을 삭감하는 오염총량 관리방법을 개선하는 효과가 있다.