가드레일 전이구간 개량 방법
    1.
    发明授权
    가드레일 전이구간 개량 방법 有权
    改善护栏过渡区域的方法

    公开(公告)号:KR101170779B1

    公开(公告)日:2012-08-03

    申请号:KR1020110013845

    申请日:2011-02-16

    Abstract: PURPOSE: A method for improving a guiderail transition section is provided to reduce costs by improving a guiderail transition section because the existing posts in the existing guiderail transition section are recycled. CONSTITUTION: A method for improving a guiderail transition section is as follows. All component except for the existing posts of the existing guide rail transition section is torn down(S100). The existing posts are reinforced according to a design criteria(S200). New posts are installed to be narrower toward a guiderail of large strength in between the existing posts according to the design criteria. A guiderail plate is installed according to the design criteria in the reinforced existing posts and the new posts(S400).

    Abstract translation: 目的:提供一种改进指导过渡部分的方法,以便通过改进指导过渡部分来减少成本,因为现有的转向部分中的现有员额被回收。 构成:改进导轨过渡部分的方法如下。 除现有导轨过渡段现有柱之外的所有部件都被拆除(S100)。 根据设计标准加强现有职位(S200)。 根据设计标准,新岗位的安置要比现有岗位之间的力量较大。 根据设计标准,在加强现有岗位和新岗位安装指导板(S400)。

    가드레일 개량 방법
    2.
    发明授权
    가드레일 개량 방법 有权
    改进防护方法

    公开(公告)号:KR101134561B1

    公开(公告)日:2012-04-13

    申请号:KR1020100112266

    申请日:2010-11-11

    Abstract: PURPOSE: A method for improving a guardrail is provided to reduce expenses because a post of an existing guardrail is recycled and improved suitable for new standard. CONSTITUTION: A method for improving a guardrail is as follows. Rest accessories are removed from the existing guardrails except only post(S100). The post is reinforced according to a design standard(S200). A guardrail plate is installed in the post according to the design standard(S300). Steps for reinforcing the post are as follows. A reinforcing pipe is installed to penetrate the post(S210). A driving pipe is installed above the reinforcing pipe to penetrate the post(S220).

    Abstract translation: 目的:提供一种改善护栏的方法,以减少费用,因为现有护栏的一个岗位被回收利用并改进,适用于新的标准。 构成:改进护栏的方法如下。 剩余的附件除了现有的护栏之外,除了后(S100)。 该岗位根据设计标准进行加固(S200)。 根据设计标准(S300),在支柱上安装护栏板。 加强职位的步骤如下。 安装加强管以穿透柱(S210)。 驱动管安装在加强管上方以穿透柱(S220)。