-
公开(公告)号:KR101266112B1
公开(公告)日:2013-05-27
申请号:KR1020120094391
申请日:2012-08-28
Applicant: 한국철도기술연구원 , 주식회사 청문티앤씨
IPC: E02D29/045 , E21D9/04 , E02D5/30 , E02D7/20
CPC classification number: E02D29/045 , E02D5/30 , E02D7/20 , E02D2200/165 , E02D2300/0034 , E21D9/04
Abstract: PURPOSE: A non-excavation type transverse structure construction method using a cut and traction method are provided to connect constructed steel tubes to each other and to easily disperse loads concentrated in a joint unit of the steel tube. CONSTITUTION: A polygon tube-shaped steel tube(200) in which a joint unit(210) is formed at an outer corner is constructed on the ground from a start part to an end part using tendons and a traction device. Another steel tube is constructed to be in contact with the pre-constructed steel tube and is connected to the joint unit of the pre-constructed steel tube. [Reference numerals] (AA) Coupler-female; (BB) Coupler-male
Abstract translation: 目的:提供一种使用切割牵引方式的非开挖式横向结构施工方法,将构造的钢管彼此连接,并容易地分散集中在钢管接头单元中的载荷。 构成:使用腱和牵引装置,从起始部到端部在地面上构造在外角处形成有接头单元(210)的多边形管状钢管(200)。 另一个钢管被构造成与预制的钢管接触并连接到预制钢管的接头单元。 (附图标记)(AA)耦合器 - 母体; (BB)耦合器 - 男性
-
-
公开(公告)号:KR101803898B1
公开(公告)日:2017-12-04
申请号:KR1020170036601
申请日:2017-03-23
Applicant: 한국철도공사 , 한국철도기술연구원 , 주식회사 에스코알티에스
Abstract: 안정감이뛰어나면서도쐐기면의경사도, 두쐐기사이에설치되는제1탄성체의종류와개수, 수직하중을분담하는제2탄성체설치등으로수직방향의처짐변위를작게그리고쉽게조정할수 있어, 부유궤도시스템이나고품질의철도선하역사진동제어용으로사용하기에적합한진동저감장치가개시된다. 상기진동저감장치는두꺼운쪽을마주하여좌우로간격을두고배치된한 쌍의쐐기, 상기쌍을이루는두 쐐기사이에설치된제1탄성체, 상기한 쌍의쐐기의저면에각각면접촉되는제1경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제1오목쐐기홈을구비하는제1오목쐐기홈부재및 상기한 쌍의쐐기의상면에각각면접촉되는제2경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제2오목쐐기홈을구비하는제2오목쐐기홈부재를포함하여구성되며, 때에따라상부에면진장치또는높이조절장치를가진다.
-
公开(公告)号:KR1020170067926A
公开(公告)日:2017-06-19
申请号:KR1020150173911
申请日:2015-12-08
Applicant: 한국철도공사 , 한국철도기술연구원 , 주식회사 에스코알티에스
Abstract: 안정감이뛰어나면서도쐐기면의경사도, 두쐐기사이에설치되는제1탄성체의종류와개수, 수직하중을분담하는제2탄성체설치등으로수직방향의처짐변위를작게그리고쉽게조정할수 있어, 부유궤도시스템이나고품질의철도선하역사진동제어용으로사용하기에적합한진동저감장치가개시된다. 상기진동저감장치는두꺼운쪽을마주하여좌우로간격을두고배치된한 쌍의쐐기, 상기쌍을이루는두 쐐기사이에설치된제1탄성체, 상기한 쌍의쐐기의저면에각각면접촉되는제1경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제1오목쐐기홈을구비하는제1오목쐐기홈부재및 상기한 쌍의쐐기의상면에각각면접촉되는제2경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제2오목쐐기홈을구비하는제2오목쐐기홈부재를포함하여구성되며, 때에따라상부에면진장치또는높이조절장치를가진다.
Abstract translation: 楔形表面而稳定性优异的倾斜度,在两种类型的一个较小的垂直偏转位移和辐条之间设置第一弹性构件的数目,并且第二弹性构件安装的,但垂直载荷的一部分,并且它可以很容易地调整浮轨道系统 或适用于优质铁路地下振动控制的减振装置。 减振装置包括彼此面对的第一弹性体的底部上的第一倾斜表面,所述一对楔形件被安装在两者之间以面对厚侧上形成的楔形,一对一对间隔开的左和右楔形接触的的 euljwa的第一凹槽楔构件和左,右第二倾斜表面,该表面分别与具有第一凹楔形槽的双楔形的上表面接触的方式形成在成为左和右的右侧边缘越来越多地在中央部逐渐加深 和配置,包括具有形成在所述楔的左和右第二凹槽变得越来越多地在从两侧的边缘处的中央部逐渐加深第二凹槽楔构件,并且具有基部隔离系统或高度调节器根据该条件的上;
-
公开(公告)号:KR102212757B1
公开(公告)日:2021-02-04
申请号:KR1020200138667
申请日:2020-10-23
Applicant: 주식회사 에스코알티에스 , 한국철도공사 , 한국철도기술연구원
Abstract: 자갈궤도를콘크리트궤도로더욱신속하게교체할수 있고, 프리캐스트콘크리트슬래브를높게하여진동을충분히흡수할수 있도록하면서수직강성을크게할수 있는콘크리트슬래브지지장치가개시된다. 상기콘크리트슬래브지지장치는고정기구를이용하여콘크리트노반에고정할수 있도록하는체결공을가지는고정부와프리캐스트콘크리트슬래브에서전달되어오는하중을받아주는하중부를가지는바닥판및 하중부에설치되고고무와고무내부에상하로간격을두고층상으로삽입된복수의보강판을구비하여구성되는보강판삽입탄성체를포함하는트랙패드를포함하는구성을한다.
-
公开(公告)号:KR101228138B1
公开(公告)日:2013-01-31
申请号:KR1020120094383
申请日:2012-08-28
Applicant: 한국철도기술연구원
CPC classification number: E21D9/04 , E21D9/0642 , E21D9/10
Abstract: PURPOSE: A wire cutting device equipped in the head of an indentation body is provided to pull the indentation body to be indented, and more efficiently cut and excavate ground in front of the indentation body. CONSTITUTION: A wire cutting device(100) equipped in the head of an indentation body(200) includes numbers of cutting wire connecting devices(130), numbers of cutting wire fixing devices(120), and a cutting wire(110). The numbers of cutting wire connecting devices(130) are installed to be extended from the front outer surface of the indentation body(200) in pulling direction. The connecting ends of the cutting wire connection devices(130) are connected to the rear of the cutting wire fixing devices(120), and the connecting ends of tendons(300) are connected to the front of the cutting wire fixing devices(120) so that the cutting wire fixing devices(120) are installed in front of the indentation body(200). A cutting wire(110) is installed between fixing blocks(121), and cuts and excavates ground in front of the indentation body(200) in response to the shape of the indentation body(200).
Abstract translation: 目的:设置在压痕体的头部上的线切割装置,用于拉出压痕体以进行凹进,并且更有效地切割和挖掘压痕体前面的地面。 构成:装配在压痕体(200)的头部的线切割装置(100)包括多个切割线连接装置(130),多个切割线固定装置(120)和切割线(110)。 切割线连接装置(130)的数量被安装成在拉伸方向上从压痕体(200)的前外表面延伸。 切割线连接装置(130)的连接端连接到切割线固定装置(120)的后部,并且腱(300)的连接端连接到切割线固定装置(120)的前部, 使得切割线固定装置(120)安装在压痕体(200)的前方。 切割线(110)安装在固定块(121)之间,并根据压痕体(200)的形状在压痕体(200)的前方切割和挖掘。
-
公开(公告)号:KR101228137B1
公开(公告)日:2013-01-31
申请号:KR1020120094382
申请日:2012-08-28
Applicant: 한국철도기술연구원
Abstract: PURPOSE: An indentation body equipped with a detachable wire cutting device is provided to easily distribute a load which is concentrated on the connection portion of the indentation body, and more efficiently cut and excavate ground in front of the indentation body. CONSTITUTION: An indentation body(200) equipped with a detachable wire cutting device(100) includes numbers of cutting wire connecting devices(130), cutting wire fixing devices(120), and a settlement prevention plate(140). The cutting wire connection devices(130) are installed to be detachable to the front of the indentation body(200), and are extended in pulling direction. The connecting ends of the cutting wire connection devices(130) are connected to the rear of the cutting wire fixing devices(120), and the connecting ends of tendons(300) are connected to the front of the cutting wire fixing devices(120) so that the cutting wire fixing devices(120) are installed in front of the indentation body(200). The settlement prevention plate(140) is formed into a horizontal plate between a cutting wire(110) and two of the cutting wire connection devices(130), and is formed to be inserted into a settlement prevention plate inserting unit(141).
Abstract translation: 目的:提供一种装有可拆卸线切割装置的压痕体,以容易地分配集中在压痕体的连接部分上的负载,并且更有效地在压痕体前方切割和挖掘地面。 构成:配备有可拆卸线切割装置(100)的压痕体(200)包括多个切割线连接装置(130),切割线固定装置(120)和防止沉降板(140)。 切割线连接装置(130)安装成能够与压痕体(200)的前方分离,并且在牵引方向上延伸。 切割线连接装置(130)的连接端连接到切割线固定装置(120)的后部,并且腱(300)的连接端连接到切割线固定装置(120)的前部, 使得切割线固定装置(120)安装在压痕体(200)的前方。 防沉降板(140)在切割线(110)和切割线连接装置(130)之间形成水平板,并形成为插入防止沉积板插入单元(141)中。
-
公开(公告)号:KR101785530B1
公开(公告)日:2017-10-18
申请号:KR1020160142144
申请日:2016-10-28
Applicant: 한국철도공사 , 한국철도기술연구원 , 주식회사 에스코알티에스
Abstract: 콘크리트기초를갖는기존자갈궤도를부유궤도로쉽게변경할수 있고, 시공속도가빨라서정규열차차단시간동안궤도를교체할수 있는프리캐스트부유궤도장치와이를위한방진장치가개시된다. 상기프리캐스트부유궤도장치와방진장치는상판과하판사이의스프링과마찰부재를통해콘크리트블록을탄성적으로지지하면서상기콘크리트블록의상하방향진동을감쇠시키고, 상기상판과상기하판사이에는상기상판과상기하판이일정간격을유지하도록하면서상기콘크리트블록이상방으로들리는것을방지하고, 상기상판의승강을안내하는승강안내가압기구가설치된구성을한다.
Abstract translation: 防振装置中公开了,并且可以容易地改变具有在浮动轨道混凝土基础的现有砾石轨道,预制浮轨道装置,其能够在施工速度快定期列车断时间与此替换轨道。 预制浮轨道装置和所述防振装置具有之间并弹性地支撑通过弹簧和混凝土块上板之间的摩擦和下板和阻尼混凝土块的垂直方向的振动,在上面板和下面板和上板 并设置升降引导加压机构,以防止下板在升高到混凝土块异常的同时保持下板之间的间隔并引导上板的升高。
-
公开(公告)号:KR101780055B1
公开(公告)日:2017-09-20
申请号:KR1020150173911
申请日:2015-12-08
Applicant: 한국철도공사 , 한국철도기술연구원 , 주식회사 에스코알티에스
Abstract: 안정감이뛰어나면서도쐐기면의경사도, 두쐐기사이에설치되는제1탄성체의종류와개수, 수직하중을분담하는제2탄성체설치등으로수직방향의처짐변위를작게그리고쉽게조정할수 있어, 부유궤도시스템이나고품질의철도선하역사진동제어용으로사용하기에적합한진동저감장치가개시된다. 상기진동저감장치는두꺼운쪽을마주하여좌우로간격을두고배치된한 쌍의쐐기, 상기쌍을이루는두 쐐기사이에설치된제1탄성체, 상기한 쌍의쐐기의저면에각각면접촉되는제1경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제1오목쐐기홈을구비하는제1오목쐐기홈부재및 상기한 쌍의쐐기의상면에각각면접촉되는제2경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제2오목쐐기홈을구비하는제2오목쐐기홈부재를포함하여구성되며, 때에따라상부에면진장치또는높이조절장치를가진다.
-
公开(公告)号:KR1020170068412A
公开(公告)日:2017-06-19
申请号:KR1020170036601
申请日:2017-03-23
Applicant: 한국철도공사 , 한국철도기술연구원 , 주식회사 에스코알티에스
CPC classification number: F16F15/02 , E01B2/00 , E01B9/68 , E01B2202/04 , F16F15/04
Abstract: 안정감이뛰어나면서도쐐기면의경사도, 두쐐기사이에설치되는제1탄성체의종류와개수, 수직하중을분담하는제2탄성체설치등으로수직방향의처짐변위를작게그리고쉽게조정할수 있어, 부유궤도시스템이나고품질의철도선하역사진동제어용으로사용하기에적합한진동저감장치가개시된다. 상기진동저감장치는두꺼운쪽을마주하여좌우로간격을두고배치된한 쌍의쐐기, 상기쌍을이루는두 쐐기사이에설치된제1탄성체, 상기한 쌍의쐐기의저면에각각면접촉되는제1경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제1오목쐐기홈을구비하는제1오목쐐기홈부재및 상기한 쌍의쐐기의상면에각각면접촉되는제2경사면을좌우로가지도록좌우의양쪽가장자리에서중앙부로갈수록점점깊어지게형성된제2오목쐐기홈을구비하는제2오목쐐기홈부재를포함하여구성되며, 때에따라상부에면진장치또는높이조절장치를가진다.
Abstract translation: 楔形表面而稳定性优异的倾斜度,在两种类型的一个较小的垂直偏转位移和辐条之间设置第一弹性构件的数目,并且第二弹性构件安装的,但垂直载荷的一部分,并且它可以很容易地调整浮轨道系统 或适用于优质铁路地下振动控制的减振装置。 减振装置包括彼此面对的第一弹性体的底部上的第一倾斜表面,所述一对楔形件被安装在两者之间以面对厚侧上形成的楔形,一对一对间隔开的左和右楔形接触的的 euljwa的第一凹槽楔构件和左,右第二倾斜表面,该表面分别与具有第一凹楔形槽的双楔形的上表面接触的方式形成在成为左和右的右侧边缘越来越多地在中央部逐渐加深 和配置,包括具有形成在所述楔的左和右第二凹槽变得越来越多地在从两侧的边缘处的中央部逐渐加深第二凹槽楔构件,并且具有基部隔离系统或高度调节器根据该条件的上;
-
-
-
-
-
-
-
-
-