IMPROVEMENTS RELATING TO THE INTERCONNECTION OF MULTIPLE RENEWABLE ENERGY POWER PLANTS
    1.
    发明申请
    IMPROVEMENTS RELATING TO THE INTERCONNECTION OF MULTIPLE RENEWABLE ENERGY POWER PLANTS 审中-公开
    关于多个可再生能源电厂相互连接的改进

    公开(公告)号:WO2017167335A1

    公开(公告)日:2017-10-05

    申请号:PCT/DK2017/050074

    申请日:2017-03-15

    Abstract: A method of controlling a first renewable energy power plant, comprising: determining power delivery of the first renewable energy power plant to a collector bus;receiving data relating to power delivery from a second renewable energy power plant connected to the collector bus;determining the combined power delivery of the first and second renewable energy power plants to the collector bus;estimating the transmission line power loss on a first transmission line between the collector bus and a power grid point of interconnection (POI) based on the combined power delivery; and regulating the power delivery from the first renewable energy power plant to compensate for the estimated transmission line power loss. Aspects of the invention also relate to a computer program product downloadable from a communication network and/or stored on a machine readable medium, comprising program code instructions for implementing a method as defined above, and to a power plant controller.

    Abstract translation: 控制第一可再生能源发电厂的方法,包括:确定第一可再生能源发电厂向收集器总线的功率输送;接收与来自第二可再生能源发电厂的功率输送有关的数据 ;确定所述第一和第二可再生能源发电厂到所述收集器总线的组合动力输送;估计所述收集器总线和电力网互连点(POI)之间的第一传输线上的所述传输线功率损失 在联合电力传输; 并且调节来自第一可再生能源发电厂的电力输送以补偿估计的输电线路功率损耗。 本发明的各方面还涉及可从通信网络下载和/或存储在机器可读介质上的计算机程序产品,包括用于实现如上定义的方法的程序代码指令以及发电厂控制器。

Patent Agency Ranking