-
公开(公告)号:WO2010099347A3
公开(公告)日:2010-10-21
申请号:PCT/US2010025453
申请日:2010-02-25
Applicant: WEATHERFORD LAMB , HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
Inventor: HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
IPC: E21B19/16
CPC classification number: E21B19/16 , E21B19/06 , E21B19/084 , E21B19/10 , E21B31/20
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
Abstract translation: 本发明一般涉及一种用于与位于钻井台上的钻机上的管状连接系统(例如焊接或锻造组件)一起使用的管道处理系统。 在一个方面,提供了一种使用在井眼处的接合组件形成管子串的方法。 连接组件包括内部接合工具和外部接合工具。 该方法包括使用电梯拾起管接头的步骤。 该方法还包括将管接头的下端邻近设置在外部接合工具中的一排管的端部定位的步骤。 该方法还包括将内部接合工具从第一位置移动到相对于电梯的第二位置的步骤,其中第二位置在管接头和管子串之间。 该方法还包括在管接头和管柱之间形成连接的步骤。 该方法还包括用夹紧工具抓住管接头并将电梯从管接头释放的步骤。 此外,该方法包括将管接头和管柱降低到井筒中的步骤。 另一方面,提供了一种使用钻机上的连接组件形成管子串的方法。 在另一方面,提供了一种用于将管接头定位在包括内部接合工具和外部接合工具的连接组件中的管道处理系统。
-
公开(公告)号:WO2009126940A3
公开(公告)日:2009-11-26
申请号:PCT/US2009040283
申请日:2009-04-10
Applicant: WEATHERFORD LAMB , MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
Inventor: MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
CPC classification number: E21B41/08 , E21B17/07 , E21B19/09 , E21B41/0014
Abstract: The present invention generally relates to an apparatus (100) and method for compensating a landing string (50) due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint (20) member to a riser (40) disposed below the floating rig (5). In another aspect, a method for compensating a landing string due to movement of a floating rig is provided.
Abstract translation: 本发明总体上涉及一种用于补偿由于浮式钻机平台的移动引起的着陆柱(50)的装置(100)和方法。 一方面,提供了一种与着陆柱一起使用的补偿系统。 补偿系统包括可附接到着陆柱的滑动接头构件,滑动接头构件具有上部和下部。 补偿系统还包括第一锁定组件,其构造成将滑动接头构件的上部连接到浮动钻机。 此外,补偿系统包括第二锁定组件,其被配置为将滑动接头(20)构件的下部连接到设置在浮动钻台(5)下方的提升管(40)。 在另一方面,提供了一种由于浮动钻机的移动而补偿着陆柱的方法。
-
公开(公告)号:CA2753573C
公开(公告)日:2015-08-11
申请号:CA2753573
申请日:2010-02-25
Applicant: WEATHERFORD LAMB
Inventor: HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
IPC: E21B19/16
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
-
公开(公告)号:AU2010217897A1
公开(公告)日:2011-09-29
申请号:AU2010217897
申请日:2010-02-25
Applicant: WEATHERFORD LAMB
Inventor: KARSTEN HEIDECKE , MICHAEL HAYES , TILTON FREDERICK T , BOUTWELL JR DOYLE F , ROBERT BADRAK , ROSS RIALS JOSEPH , HAVENS DAVID J
IPC: E21B19/16
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
-
公开(公告)号:AU2012201418A1
公开(公告)日:2012-04-05
申请号:AU2012201418
申请日:2012-03-08
Applicant: WEATHERFORD LAMB
Inventor: MOUTON DAVID E , HAVENS DAVID J , BOUTWELL DOYLE , FISHER RALEIGH , HEIDECKE KARSTEN , HAYES MICHAEL , HOLLINGSWORTH JIM
Abstract: LANDING STRING COMPENSATOR Abstract A method for moving a landing string (50) positioned within a blowout preventer (BOP) (80) during a safety-critical situation, the method comprising: connecting an assembly (140) to the landing string (50), the assembly (140) having a first lock (145), a second lock (145) and a slip joint; securing a lower portion of the slip joint to a riser (40) by activating the second lock (145); securing an upper portion of the slip joint (115) to a floating vessel (15) by activating the first lock (145); cutting the landing string (50) by activating a shear ram (85) in the BOP (80) upon determination of the safety-critical situation; and moving a portion of the landing string (50) relative to the BOP (80).
-
公开(公告)号:CA2721077C
公开(公告)日:2013-12-24
申请号:CA2721077
申请日:2009-04-10
Applicant: WEATHERFORD LAMB
Inventor: MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
Abstract: The present invention generally relates to an apparatus (100) and method for compensating a landing string (50) due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint (20) member to a riser (40) disposed below the floating rig (5). In another aspect, a method for compensating a landing string due to movement of a floating rig is provided.
-
公开(公告)号:CA2721077A1
公开(公告)日:2009-10-15
申请号:CA2721077
申请日:2009-04-10
Applicant: WEATHERFORD LAMB
Inventor: MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
Abstract: The present invention generally relates to an apparatus (100) and method for compensating a landing string (50) due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint (20) member to a riser (40) disposed below the floating rig (5). In another aspect, a method for compensating a landing string due to movement of a floating rig is provided.
-
公开(公告)号:AU2014221293A1
公开(公告)日:2014-09-25
申请号:AU2014221293
申请日:2014-09-09
Applicant: WEATHERFORD LAMB
Inventor: HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL JR DOYLE F , BADRACK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
IPC: E21B19/16
Abstract: PIPE HANDLING SYSTEM A pipe handling system (100) for locating a pipe joint (75) in a joining assembly (420) that includes an internal joining tool (230) and an external joining tool (205), the system (100) comprising: a gripper (520) configured to grip a surface of the pipe joint (75); an elevator (215) configured to pick up the pipe joint (75) and position the pipe joint (75) adjacent a string of pipe (60) disposed in the external joining tool (205); and a deployment assembly (150) having a cable (265) that is used to position the internal joining tool (230) inside the pipe joint (75).
-
公开(公告)号:CA2753573A1
公开(公告)日:2010-09-02
申请号:CA2753573
申请日:2010-02-25
Applicant: WEATHERFORD LAMB
Inventor: HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
IPC: E21B19/16
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
-
公开(公告)号:AU2009234273A1
公开(公告)日:2009-10-15
申请号:AU2009234273
申请日:2009-04-10
Applicant: WEATHERFORD LAMB
Inventor: HAYES MICHAEL , FISHER RALEIGH , HEIDECKE KARSTEN , HOLLINGSWORTH JIM , MOUTON DAVID E , BOUTWELL DOYLE , HAVENS DAVID J
-
-
-
-
-
-
-
-
-