Abstract:
A method for detecting a potential-induced degradation (PID) of PV modules of a PV installation, having a measurement pass, includes operating a PV generator of the PV installation at a maximum power point (MPP) with values of generator voltage (UMPP) and generator current (IMPP) associated with the maximum power point (MPP), and operating the PV generator of the PV installation at a first generator voltage (U1) and detection of a first generator current (I1) associated with the first generator voltage (U1). The method also includes operating the PV generator of the PV installation additionally at a second generator voltage (U2) and detection of a second generator current (I2) associated with the second generator voltage (U2), wherein the first generator voltage (U1) dictates that a first power (P1), with P1=U1*I1, of the PV generator at the first generator voltage (U1) is in a predefined first ratio (V1), with V1=P1/PMPP and V1≤1, with the power (PMPP) at the maximum power point (MPP) of the PV generator, and wherein the second generator voltage (U2) dictates that a second power (P2), with P2=U2*I2, of the PV generator at the second generator voltage (U2) is in a predefined second ratio (V2), with V2=P2/P1 and V2
Abstract:
A device and corresponding method for monitoring a photovoltaic system to detect an occurrence of events impairing normal operation of the photovoltaic system is provide. The photovoltaic system includes a photovoltaic generator including a first group of photovoltaic modules and a second group of photovoltaic modules being different from the first group. The device includes a first and a second pair of coupling means, both pairs including signal coupling-in means for coupling a test signal into the photovoltaic generator, and a signal coupling-out means for coupling out a response signal from the photovoltaic generator, the first pair of coupling means configured to selectively detect the occurrence of the events in the first group of photovoltaic modules, and the second pair of coupling means configured to selectively detect the occurrence of the events in the second group of photovoltaic modules.
Abstract:
For determining the topology of a grid section of an AC power grid, the grid section comprising a grid connection point, at least one branch branching off from the grid connection point and including a plurality of energy consumption and/or energy generation units, and at least one measurement point in the at least one branch, dependencies of variations of a grid voltage measured at the at least one measurement point based on variations of connection power values of at least some individual ones of the energy consumption and/or energy generation units are determined.
Abstract:
A method includes searching for a point of maximum power based on a systematic load variation, setting the point of maximum power as the operating point of the photovoltaic generator, and tracking the operating point based on a load variation with a narrow variation range. The method also includes analyzing operating variables of the photovoltaic generator to determine the level of probability that the operating point deviates from the point of maximum power, selectively interrupting the tracking and carrying out another search to determine the point of maximum power as a function of the analysis of the operating variables, and setting the point of maximum power as the operating point, and resuming the tracking. The method further takes into account previous searches carried out in the presence of comparable operating variables to determine the probability.
Abstract:
A method for detecting a potential-induced degradation (PID) of PV modules of a PV installation includes operating a PV generator at a maximum power point (MPP), at a first generator voltage (U1) and first generator current (I1), and at a second generator voltage (U2) and second generator current (I2), where a first power (P1) at the first generator voltage (U1) is in a predefined first ratio V1=P1/PMPP and V1≤1, with the power (PMPP) at the maximum power point (MPP) of the PV generator, and where a second power (P2) at the second generator voltage (U2) is in a predefined second ratio V2=P2/P1 and V2
Abstract:
A method for determining a currently maximum possible power of a photovoltaic (PV) installation operated in a curtailed manner and including a PV generator having at least one string, wherein the at least one string comprises a series circuit of PV modules, in which at least one PV module is connected to adjacent PV modules in the string via a coupling circuit. The installation further includes an inverter which is connected, on the output side, to an energy supply grid and is connected, on the input side, to the PV generator. The installation also includes a controller for controlling the inverter and the coupling circuit, wherein the controller, in conjunction with the coupling circuit, is designed to vary a power drain of the PV module assigned to it relative to a power drain of the adjacent PV modules during operation of the PV installation.
Abstract:
A method for detecting an arc fault in a photovoltaic power circuit includes operating a photovoltaic generator at a first working point. A first signal related to a DC-current and/or a DC-voltage in the power circuit is determined. The first signal is analyzed and it is determined whether the signal indicates the presence of an electric arc in the power circuit. If so, the photovoltaic generator is operated at a second working point and a second signal related to the DC-current and/or the DC-voltage is determined. The first and second signals are then compared; and the occurrence of an arc fault in the power circuit is selectively signaled based on the comparison.
Abstract:
A protection system configured to couple between a generator that has a number of partial strings and an inverter includes a control device, and a series-connection switching device configured to selectively connect the partial strings together in series. The system also includes a parallel-connection switching device configured to selectively connect the partial strings together in parallel, wherein the series-connection switching device is actuated by the control device such that it interrupts the series connection of the partial strings in case of a hazard, and the parallel-connection switching device is actuated by the control device such that it connects the partial strings together in parallel in case of a hazard.
Abstract:
An inverter for feeding a grid-compatible AC voltage into a grid is described, wherein the inverter includes an inverter bridge for converting a DC voltage to a first AC voltage and a grid interface between the inverter bridge and the grid for converting the first AC voltage to the grid-compatible AC voltage for feeding into the grid. An AC interface via which an AC module for feeding into the grid can be connected, is arranged between the inverter bridge and the grid interface.
Abstract:
A method includes searching for a point of maximum power based on a systematic load variation, setting the point of maximum power as the operating point of the photovoltaic generator, and tracking the operating point based on a load variation with a narrow variation range. The method also includes analyzing operating variables of the photovoltaic generator to determine the level of probability that the operating point deviates from the point of maximum power, selectively interrupting the tracking and carrying out another search to determine the point of maximum power as a function of the analysis of the operating variables, and setting the point of maximum power as the operating point, and resuming the tracking. The method further takes into account previous searches carried out in the presence of comparable operating variables to determine the probability.