Fault tolerant system and method for performing fault tolerant
    1.
    发明授权
    Fault tolerant system and method for performing fault tolerant 有权
    用于执行容错的容错系统和方法

    公开(公告)号:US09400666B2

    公开(公告)日:2016-07-26

    申请号:US14029181

    申请日:2013-09-17

    Abstract: A fault tolerant system includes a primary virtual machine that is formed on a primary machine in which a primary hypervisor runs, and is configured to input virtual interrupt based on an external interrupt from the primary hypervisor to a primary guest OS, and a secondary virtual machine that is formed on a secondary machine in which a secondary hypervisor runs, and is configured to input the virtual interrupt to a secondary guest OS on the basis of timing information on the virtual interrupt transmitted from the primary virtual machine. The primary virtual machine is configured to transmit the timing information on the virtual interrupt including the number of branch instructions executed by the primary guest OS before inputting the virtual interrupt, and including an execution suspension position when inputting the virtual interrupt to the secondary virtual machine.

    Abstract translation: 容错系统包括形成在主虚拟机管理程序运行的主机上的主虚拟机,并且被配置为基于来自主虚拟机管理程序的外部中断将主要虚拟中断输入到主客户机OS,以及次虚拟机 其形成在二级管理程序运行的辅助计算机上,并且被配置为基于从主虚拟机发送的虚拟中断的定时信息将虚拟中断输入到辅助客户机OS。 主虚拟机被配置为在虚拟中断之前发送包括由主客户OS执行的分支指令的数量的虚拟中断的定时信息,并且在向虚拟中断输入虚拟中断时包括执行暂停位置。

    Automatically replacing hardware controller in a control system

    公开(公告)号:US11874646B2

    公开(公告)日:2024-01-16

    申请号:US17887912

    申请日:2022-08-15

    CPC classification number: G05B19/4183 G05B19/41855 H04L67/125

    Abstract: A control system includes at least one field device, a first control apparatus, a second control apparatus, a cache server, and a network. The first control apparatus has a first field device directly connected thereto and includes a first access route controller and a first control application capable of controlling the first field device. The second control apparatus includes a second access route controller and a second control application capable of controlling the first field device. The cache server includes a memory and a third access route controller. The first through third access route controllers are configured to work together to be capable of transferring, to the cache server, an input/output instruction for the first field device from the second control application.

    Equipment registration terminal, equipment registration method, and recording medium having recorded thereon equipment registration program

    公开(公告)号:US11774543B2

    公开(公告)日:2023-10-03

    申请号:US17451004

    申请日:2021-10-15

    CPC classification number: G01S5/0244 G01S5/021 G01S5/0236

    Abstract: Provided is an equipment registration terminal comprising: a position determination unit configured to determine a position of the equipment registration terminal; a positioning means storage unit configured to store information on a positioning means to determine the position of the equipment registration terminal; an error estimation unit configured to estimate a positioning error in the position of the equipment registration terminal based on the information on the positioning means; and an equipment registration unit configured to register, in registration of a position of equipment to be registered by using the position of the equipment registration terminal, an error in the position of the equipment based on the positioning error, in an associated manner. The positioning means storage unit may store information indicating a positioning method in the positioning means, and the error estimation unit may estimate the positioning error according to the positioning method.

    Control system, control apparatus, and method of accessing field device

    公开(公告)号:US12216453B2

    公开(公告)日:2025-02-04

    申请号:US18202376

    申请日:2023-05-26

    Abstract: A control system includes at least one field device, a first control apparatus, a second control apparatus, and a network. The first control apparatus has a first field device, included among the one or more field devices, directly connected thereto and includes a first access route controller and a first control application capable of controlling the first field device. The second control apparatus includes a second access route controller and a second control application capable of controlling the first field device. The first access route controller and the second access route controller are configured to work together to control an input/output route from the first control application and the second control application to the first field device.

    Control system, control apparatus, and method of accessing field device

    公开(公告)号:US11703831B2

    公开(公告)日:2023-07-18

    申请号:US17166478

    申请日:2021-02-03

    CPC classification number: G05B19/4183 G05B19/41855 H04L67/125

    Abstract: A control system includes at least one field device, a first control apparatus, a second control apparatus, and a network. The first control apparatus has a first field device, included among the one or more field devices, directly connected thereto and includes a first access route controller and a first control application capable of controlling the first field device. The second control apparatus includes a second access route controller and a second control application capable of controlling the first field device. The first access route controller and the second access route controller are configured to work together to control an input/output route from the first control application and the second control application to the first field device.

    Automatically replacing hardware controller in a control system

    公开(公告)号:US11449038B2

    公开(公告)日:2022-09-20

    申请号:US17166492

    申请日:2021-02-03

    Abstract: A control system includes at least one field device, a first control apparatus, a second control apparatus, a cache server, and a network. The first control apparatus has a first field device directly connected thereto and includes a first access route controller and a first control application capable of controlling the first field device. The second control apparatus includes a second access route controller and a second control application capable of controlling the first field device. The cache server includes a memory and a third access route controller. The first through third access route controllers are configured to work together to be capable of transferring, to the cache server, an input/output instruction for the first field device from the second control application.

    Information processing device, evaluation method, and computer-readable recording medium

    公开(公告)号:US12292730B2

    公开(公告)日:2025-05-06

    申请号:US17895580

    申请日:2022-08-25

    Abstract: When a worker executes an operation on an actual plant, an information processing device generates a first calculation result obtained by calculating a behavior of the actual plant after execution of the operation using a virtual plant following an operational status of the actual plant and generates each second calculation result obtained by calculating a behavior of the actual plant with respect to each of operation pattern plans corresponding to a state of the actual plant. The information processing device evaluates the operation that is executed by the worker based on the first calculation result and the second calculation result.

Patent Agency Ranking