Abstract:
A bridge repairing method is provided to carry out repairing and waterproof works on a bridge slab of a bridge at the same time by applying repairing material including MMA(Methyl Methacrylate) resin to broken part of the bridge slab. A bridge repairing method includes the steps of: removing a broken part of a bridge slab and a slab pavement thereon; applying a repairing material(100) including MMA(Methyl Methacrylate) resin to the broken part; and paving a new slab pavement(21) on the repaired part of the bridge slab. Viscosity of the MMA resin ranges from 50 to 300 cP. The MMA resin contains 67~75w% of MMA, 10~20w% of PMMA, and 10~20w% of Butyl Acrylate.
Abstract:
A road structure for melting snow is provided to obtain excellent constructability without the limit of the traffic opening, and to obtain excellent durability and efficiency after construction. A road structure for melting snow is composed of a groove(100) formed on a road to have narrower width than the width of a wheel(20) of a vehicle traveling on a road(10), and a heating device(200) which is vertically installed in the groove. The heating device is composed of a plate type heating element and a protection element. Filler(300) for filling up an air gap is spread in the state where the heating device is installed.
Abstract:
본 발명은 도로(10)상을 통행하는 차량의 바퀴(20)의 폭(W`)에 비해 좁은 폭(W)을 갖도록, 상기 도로(10)에 형성된 홈(100); 홈(100)에 설치된 발열장치(200);를 포함하는 융설용 도로구조물을 제시함으로써, 교통개방의 제한을 받지 않아 시공성이 우수하고, 시공 후 도로 구조물의 내구성이 우수할 뿐만 아니라, 효율이 우수하다는 효과를 얻도록 한다. 도로, 융설, 홈
Abstract:
본 발명은 교량 상판(10)의 손상된 부분 및 그 상부의 교면 포장체(20)를 제거하는 손상부 제거단계; 교량 상판(10)의 손상된 부분에 MMA 수지를 포함하는 재질의 보수재(100)를 도포하는 보수재 도포단계; 교량 상판(10)의 보수된 부분 상부에 새로운 교면 포장체(21)를 형성하는 교면 포장체 형성단계;를 포함하여 구성된다. 따라서, 교통의 조기 개방을 달성하면서도, 교량의 구조적 안정성을 충분히 확보할 수 있도록 한다. 교량, 상판, 보수
Abstract:
PURPOSE: A self-reactive acryl-based resin composition and an acryl-based polymer concrete pavement are provided to enable construction with ultrathin layers and low temperature quick hardening and to ensure an excellent adhesive property, water resistance, durability, noise reduction, and flexibility at low temperatures. CONSTITUTION: A self-reactive acryl-based resin composition comprises 20-40 parts by weight of PMMA, 20-35 parts by weight of MMA, 20-30 parts by weight of one or more kinds of methacrylate-based monomer excluding MMA, 5-15 parts by weight of urethane acrylate monomer, 0.1-5 parts by weight of cross-linking agent, and 1-10 parts by weight of polymerization accelerator.
Abstract:
PURPOSE: A road pavement structure using a dowel bar and a construction method thereof are provided to improve durability by preventing the road pavement structure from being corroded. CONSTITUTION: A construction method of a road pavement structure using a dowel bar is as follows. A holder is installed on the top of a base layer or an auxiliary base layer. A dowel bar(100) is installed on the top of the holder. One end of the dowel bar is welded in the holder, and the other end is slidably installed in the holder. The dowel bar comprises a pipe body(110) and filler(120). The pipe body has a filling space. The pipe body is buried in the ground in order to couple both sides of a joint of a road pavement. The pipe body is filled with the filler.
Abstract:
A road structure for reducing the heat island phenomenon is provided to exclude the necessity of artificial water spray work and to restrain a rise in temperature on a road surface effectively. A road structure for reducing the heat island phenomenon comprises a perforated pipe insertion groove(110) formed along a traffic lane of a road, a perforated pipe(100) inserted to the perforated pipe insertion groove and installed to supply water toward a water supply layer, filler(120) made of vegetative soil and filling up a remaining space of the perforated pipe insertion groove, a cover member(130) closing an opening of the perforated pipe insertion groove and provided with a through hole for vegetation, a housing member for vegetation provided with a housing space of plants and an inflow water through hole and inserted to the upper part of the perforated pipe, a surface layer(200) formed by porous asphalt, a water supply layer(300) installed to the lower part of the surface layer and made of a water permeable and movable material to supply water to the surface layer, and an impermeable layer(400) made of an impermeable material and formed on the lower part of the water supply layer.