-
公开(公告)号:FI11468U1
公开(公告)日:2016-12-16
申请号:FIU20164175
申请日:2016-08-30
Applicant: KONE CORP
Inventor: HAIKONEN AKI , SAARELA SAMI , AHONIEMI SAKKE , MÄKELÄ KLAUS
-
公开(公告)号:FI123182B
公开(公告)日:2012-12-14
申请号:FI20125178
申请日:2012-02-16
Applicant: KONE CORP
Inventor: HAKALA TUOMO , SAARELA SAMI , KALLIOMAEKI JAAKKO , SALORANTA JARKKO
-
公开(公告)号:AU2020313283A1
公开(公告)日:2022-02-17
申请号:AU2020313283
申请日:2020-07-10
Applicant: KONE CORP
Inventor: HAAPANIEMI MARKKU , RÄSÄNEN MATTI , SAARELA SAMI , VENHO ANSSI , MIKKONEN JANNE , LANZ OTTO , VIITA-AHO TARVO , KERE PETRI
Abstract: The invention relates to a method for transporting construction material and/or equipment into and inside a building (1) under construction, wherein the building (1) under construction comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing a control system (11) configured to automatically operate one or more transporting devices (2-6, GE), including at least an elevator (GE); providing a storage (8) at the construction site of the building; and transporting into the storage (8) at the construction site of the building (1) under construction plurality of transport containers (9) containing construction material and/or equipment; storing said transport containers (9) in the storage (8); and delivering transport containers (9) belonging to said plurality of transport containers from said storage (8) to different destination floors (F1-Fn), the delivering comprising obtaining an order to deliver a transport container (9), the order identifying the transport container (9) to be delivered; and retrieving the transport container (9) identified in the order from the storage (8); and moving said transport container (9) at least horizontally to a container loading floor (FO) of the building (1) under construction; and loading said transport container (9) on the load receiving unit (7) for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container (9); and moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor of said transport container (9); and unloading said transport container (9) from the load receiving unit (7) to the destination floor of said transport container (9). The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building (1) under construction.
-
14.
公开(公告)号:AU2020267146A1
公开(公告)日:2021-05-27
申请号:AU2020267146
申请日:2020-11-09
Applicant: KONE CORP
Inventor: KOSHKINEN ANTTI , HARTIKAINEN PETRI , HALLIKAINEN PEKKA , SALOMÄKI JANNE , SAARELAINEN ANTTI , WENLIN HENRI , JOKINEN RISTO , VLASOV TIMO , PURANEN MIKKO , PUTKINEN ESA , LAAKSONHEIMO JYRKI , STOLT LAURI , KAUPPINEN TUUKKA , SALORANTA JARKKO , HÄMÄLÄINEN HILKKA , SAARELA SAMI
Abstract: According to an aspect, there is provided an elevator parking brake (100, 136) comprising brake pads (104) configured to provide a braking force against a guide rail (102) in a loading and unloading situation of an elevator car (400); and at least one sensor (114). The elevator parking brake (100, 136) is configured to allow a predetermined amount of movement within the elevator parking brake (100, 134) in the loading and unloading situation of the elevator car (400), and the at least one sensor (114) is configured to provide at least one indication associated with the movement within the elevator parking brake (100, 136) in the loading and unloading situation of the elevator car (400). 118 140 -- --- 102 100 ,106 1114 -- - -108 u 120 132 114 130 / -- 128 136----t. 134 124 -- 138 -F F--'0
-
公开(公告)号:FI20125253A
公开(公告)日:2013-09-10
申请号:FI20125253
申请日:2012-03-09
Applicant: KONE CORP
Inventor: SAARELA SAMI , LINDBERG JUKKA , VIKSTROEM RISTO , KOLEHMAINEN SEPPO , TIAINEN VESA , DE JONG JOHANNES , TAAVELA JUHA
IPC: B66B13/28
-
-
-
-