ELEVATOR PARKING BRAKE, METHOD FOR OPERATING AN ELEVATOR PARKING BRAKE, AND CONTROL DEVICE FOR AN ELEVATOR PARKING BRAKE

    公开(公告)号:AU2022415088A1

    公开(公告)日:2024-06-27

    申请号:AU2022415088

    申请日:2022-11-14

    Applicant: KONE CORP

    Abstract: An elevator parking brake, a method for operating an elevator parking brake, and a control device for an elevator parking brake are provided. The elevator parking brake comprises a parking brake frame attachable to an elevator car, a brake pad configured to be brought in contact with a guide rail guiding the elevator car along an elevator shaft, and an actuating mechanism mounted on the parking brake frame, for bringing the brake pad in contact with the guide rail and retracting the brake pad from the guide rail. The actuating mechanism comprises a motor, an actuating member and a conversion mechanism configured to convert a rotational movement of the motor into a linear movement of the actuating member. The actuating member thereby brings the brake pad in contact with the guide rail and retracts the brake pad from the guide rail. The conversion mechanism further comprises a cam mechanism having a cam member driven to rotate by the rotational movement of the motor, wherein a driving profile of the cam member is in contact with the actuating member. The driving profile is configured to convert the rotational movement of the cam member into the linear movement of the actuating member.

    Method and elevator arrangement
    4.
    发明专利

    公开(公告)号:AU2020313284A1

    公开(公告)日:2022-02-17

    申请号:AU2020313284

    申请日:2020-07-10

    Applicant: KONE CORP

    Abstract: The invention relates to a method for managing flow of people and goods within a building (1) under construction, comprising providing one or more elevator control systems (4,8;4') for automatically controlling movement of elevator cars; providing a first passenger elevator (PEI), the first passenger elevator comprising a first passenger elevator car (3) for transporting people, the first passenger elevator car (3) being vertically movable in an elevator hoistway (2) formed inside the building (1) under construction, vertical movement of the car (3) being automatically controlled by an elevator control system (4;4'), the first passenger elevator car (3) comprising an interior delimited by floor, walls, ceiling and at least one automatic door (5); and providing a goods elevator (GE), the goods elevator comprising a goods elevator car (7) for transporting goods, the goods elevator car (7) being vertically movable beside the first passenger elevator car (3) in an elevator hoistway (6) formed inside the building (1) under construction, vertical movement of the goods elevator car (7) being automatically controlled by an elevator control system (8;4'), the goods elevator car (7) comprising at least a transport platform (7a); using the first passenger elevator (PEI) to transport passengers between floors of the building (1) under construction; and using the goods elevator (GE) to transport goods between floors (FO-Fn) of the building (1) under construction. The invention also relates to an arrangement for managing flow of people and goods within a building (1) under construction, which arrangement implements the method.

    CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD

    公开(公告)号:AU2020482689A1

    公开(公告)日:2023-07-27

    申请号:AU2020482689

    申请日:2020-12-22

    Applicant: KONE CORP

    Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway (2) formed in a building (1), the hoistway (2) comprising at least one hoistway opening (O) leading in horizontal direction out from the hoistway (2), the opening (O) being delimited by a lower edge structure (3) and an upper edge structure (4); and a load (9,10) in the hoistway (1) lower than said opening (O); and a hoisting arrangement (A;A';A'';A''';A'''') for hoisting said load (9,10), wherein said hoisting arrangement (11-13) comprises a support structure (11;11';11'';11''';11'''';11''''') mounted higher than said load (9,10); and a hoisting device (12); and at least one flexible tension member (13) connected or at least connectable to said load (9,10); wherein the at least one flexible tension member (13) is movable with said hoisting device (12) in particular for thereby transmitting a hoisting force to said load (9,10) to be hoisted. Said support structure (11) comprises an anchoring beam structure (110) comprising a lower end (111) engaging the lower edge structure (3), and an upper end (112) engaging the upper edge structure (4); and a support beam structure (113) connected to the anchoring beam structure (110) and protruding from the anchoring beam structure (110) into the hoistway (2); and wherein said at least one flexible tension member (13) hangs in the hoistway supported by the support beam structure (113). The invention also relates to a method implementing the construction arrangement.

    Method and arrangement
    7.
    发明专利

    公开(公告)号:AU2020312640A1

    公开(公告)日:2022-02-17

    申请号:AU2020312640

    申请日:2020-07-10

    Applicant: KONE CORP

    Abstract: The invention relates to a method for transporting construction material and/or equipment inside a building under construction (1), wherein the building under construction (1) comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing an elevator (GE) for transporting transport containers (9) in the building under construction (1), said elevator (GE) comprising at least a load receiving unit (7) vertically movable along one or more guide rail lines (16) in an elevator shaft (S) formed in the building under construction (1); and providing plurality of transport containers (9) each comprising a container body (9a), and an identification (10) provided on the container body for identifying the container and/or its destination in the building, most preferably the destination floor (F0-Fn) in the building under construction (1); providing one or more detectors (18a-18d) within the building under construction (1) for detecting identifications (10) of containers (9) when they are within the detection ranges of the one or more detectors (18a- 18d); moving a first transport container (9) belonging to said plurality of transport containers (9) to a loading floor (F0); loading the first transport container (9) belonging to said plurality of containers (9) on the load receiving unit (7); determining by a control system (11) destination floor (F1-Fn) of the first container (9) comprising detecting the identification (10) of the first transport container (9) with a detector (18a-18d); automatically moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor (F1-Fn) of the first container (9); and unloading the first transport container (9) from the load receiving unit (7) to the destination floor (F1-Fn) of said first container (9). The invention also relates to a method for constructing a building and an arrangement, which implement the aforementioned method.

    Method and elevator arrangement
    9.
    发明专利

    公开(公告)号:AU2020313283A1

    公开(公告)日:2022-02-17

    申请号:AU2020313283

    申请日:2020-07-10

    Applicant: KONE CORP

    Abstract: The invention relates to a method for transporting construction material and/or equipment into and inside a building (1) under construction, wherein the building (1) under construction comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing a control system (11) configured to automatically operate one or more transporting devices (2-6, GE), including at least an elevator (GE); providing a storage (8) at the construction site of the building; and transporting into the storage (8) at the construction site of the building (1) under construction plurality of transport containers (9) containing construction material and/or equipment; storing said transport containers (9) in the storage (8); and delivering transport containers (9) belonging to said plurality of transport containers from said storage (8) to different destination floors (F1-Fn), the delivering comprising obtaining an order to deliver a transport container (9), the order identifying the transport container (9) to be delivered; and retrieving the transport container (9) identified in the order from the storage (8); and moving said transport container (9) at least horizontally to a container loading floor (FO) of the building (1) under construction; and loading said transport container (9) on the load receiving unit (7) for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container (9); and moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor of said transport container (9); and unloading said transport container (9) from the load receiving unit (7) to the destination floor of said transport container (9). The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building (1) under construction.

    METHOD FOR MODERNIZING ELEVATOR SYSTEM

    公开(公告)号:AU2021201478A1

    公开(公告)日:2021-11-11

    申请号:AU2021201478

    申请日:2021-03-09

    Applicant: KONE CORP

    Abstract: Abstract The invention relates to a method for modernizing an elevator system, which elevator system comprises a first elevator (1) comprising a first car (2) in a first hoistway (3), a second elevator (4), comprising a second car (5) in a second hoistway (6), the method comprising using the first and second car (2,5) for transporting passengers and/or goods between vertically displaced floors of a building (7), and thereafter removing the first elevator car from use for transporting passengers and/or goods between vertically displaced floors, and thereafter installing a construction time elevator (8) into the lower end of the first hoistway (3), the traveling zone (Z3) of the car (9) of the construction time elevator (8) covering only partially the height of the first hoistway (3); and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors of the building (7), during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z3) of the car (9) of the construction time elevator (8); and thereafter changing the traveling zone (Z3) of the car (9) of the construction time elevator (8) to extend higher (Z5) in the hoistway (3), and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors, during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z5) of the car (9) of the construction time elevator. Fig. 1 7-3 F - 6 12a F 18a 18b' 9