46.
    发明专利
    未知

    公开(公告)号:FI20115920A0

    公开(公告)日:2011-09-19

    申请号:FI20115920

    申请日:2011-09-19

    Applicant: KONE CORP

    Abstract: The object of the invention is a traction member arrangement implemented with a belt-type structure (1), for transmitting rotational movement produced by drive machinery into linear movement, which belt-type structure (1) comprises a shell provided with a back part (Id), inside which is a plurality of tension means (7-7e) arranged to be in the direction of the length of the belt-type structure (1), as well as an elevator provided with the aforementioned traction member arrangement. The tension means (7b, 7c, 7e) that are in the proximity of the edges of the belt-type structure (1) are more flexible than the tension means (7a, 7d) that are in the proximity of the longitudinal center line of the belt-type structure.

    Method and elevator arrangement
    48.
    发明专利

    公开(公告)号:AU2020313283A1

    公开(公告)日:2022-02-17

    申请号:AU2020313283

    申请日:2020-07-10

    Applicant: KONE CORP

    Abstract: The invention relates to a method for transporting construction material and/or equipment into and inside a building (1) under construction, wherein the building (1) under construction comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing a control system (11) configured to automatically operate one or more transporting devices (2-6, GE), including at least an elevator (GE); providing a storage (8) at the construction site of the building; and transporting into the storage (8) at the construction site of the building (1) under construction plurality of transport containers (9) containing construction material and/or equipment; storing said transport containers (9) in the storage (8); and delivering transport containers (9) belonging to said plurality of transport containers from said storage (8) to different destination floors (F1-Fn), the delivering comprising obtaining an order to deliver a transport container (9), the order identifying the transport container (9) to be delivered; and retrieving the transport container (9) identified in the order from the storage (8); and moving said transport container (9) at least horizontally to a container loading floor (FO) of the building (1) under construction; and loading said transport container (9) on the load receiving unit (7) for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container (9); and moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor of said transport container (9); and unloading said transport container (9) from the load receiving unit (7) to the destination floor of said transport container (9). The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building (1) under construction.

    METHOD FOR MODERNIZING ELEVATOR SYSTEM

    公开(公告)号:AU2021201478A1

    公开(公告)日:2021-11-11

    申请号:AU2021201478

    申请日:2021-03-09

    Applicant: KONE CORP

    Abstract: Abstract The invention relates to a method for modernizing an elevator system, which elevator system comprises a first elevator (1) comprising a first car (2) in a first hoistway (3), a second elevator (4), comprising a second car (5) in a second hoistway (6), the method comprising using the first and second car (2,5) for transporting passengers and/or goods between vertically displaced floors of a building (7), and thereafter removing the first elevator car from use for transporting passengers and/or goods between vertically displaced floors, and thereafter installing a construction time elevator (8) into the lower end of the first hoistway (3), the traveling zone (Z3) of the car (9) of the construction time elevator (8) covering only partially the height of the first hoistway (3); and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors of the building (7), during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z3) of the car (9) of the construction time elevator (8); and thereafter changing the traveling zone (Z3) of the car (9) of the construction time elevator (8) to extend higher (Z5) in the hoistway (3), and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors, during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z5) of the car (9) of the construction time elevator. Fig. 1 7-3 F - 6 12a F 18a 18b' 9

    Disposición de ascensor y ascensor

    公开(公告)号:ES2865161T3

    公开(公告)日:2021-10-15

    申请号:ES16745775

    申请日:2016-07-15

    Applicant: KONE CORP

    Abstract: Disposición de ascensor que comprende un ascensor con un sistema de control de ascensor, un sistema de seguridad y un modo de inspección o mantenimiento, cuyo ascensor tiene una cabina (2) de ascensor dispuesta para subir y bajar en un hueco (1c) de ascensor a lo largo de carriles (3) de guía, y cuya cabina (2) de ascensor está equipada con un techo (2a), en el que el techo (2a) de la cabina (2) de ascensor está dispuesto para descubrir la parte superior de la cabina (2) de ascensor para formar un espacio de trabajo seguro natural para realizar tareas de inspección y mantenimiento desde el interior de cabina (2) de ascensor hasta el hueco (1c) de ascensor y para formar el espacio de refugio en el interior de cabina (2) de ascensor, caracterizado por que la disposición comprende un mecanismo (13) de control para controlar la posición del techo (2a), comprendiendo el mecanismo (13) de control al menos un elemento (13a) de disparo que está dispuesto para moverse en relación con el movimiento del techo de la cabina del ascensor, e interruptores (12a, 12b) de control activados por el movimiento del elemento (13a) de disparo y conectados operativamente al menos al sistema de control del ascensor y al sistema de seguridad del ascensor.

Patent Agency Ranking