Elevator car and construction-time elevator arrangement and method

    公开(公告)号:AU2020204274A1

    公开(公告)日:2021-03-11

    申请号:AU2020204274

    申请日:2020-06-26

    Applicant: KONE CORP

    Abstract: ELEVATOR CAR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT AND METHOD Abstract The invention relates to an elevator car (C,C2,C3,C',C") comprising a first floor (1;21;31;1';21') for delimiting a transport space (5;25;35) above it, and a second floor (2;22;32) for delimiting a second transport space (6;26;36) above it. One of the first and second floor (1,2;21,22;31,32;1',2;21',22) is a displaceable floor, the elevator car (C,C2,C3,C',C") being shiftable between a double-decker state and a single decker -state by displacing the displaceable floor (2;22;31). The invention also relates to a construction-time elevator arrangement and a method for elevator use during construction of a building, which implement the elevator car (C,C2,C3,C',C"). Figure 1 Fig. 1 B d 200 4 1 d Fig. 2

    Method and arrangement
    2.
    发明专利

    公开(公告)号:AU2020312640A1

    公开(公告)日:2022-02-17

    申请号:AU2020312640

    申请日:2020-07-10

    Applicant: KONE CORP

    Abstract: The invention relates to a method for transporting construction material and/or equipment inside a building under construction (1), wherein the building under construction (1) comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing an elevator (GE) for transporting transport containers (9) in the building under construction (1), said elevator (GE) comprising at least a load receiving unit (7) vertically movable along one or more guide rail lines (16) in an elevator shaft (S) formed in the building under construction (1); and providing plurality of transport containers (9) each comprising a container body (9a), and an identification (10) provided on the container body for identifying the container and/or its destination in the building, most preferably the destination floor (F0-Fn) in the building under construction (1); providing one or more detectors (18a-18d) within the building under construction (1) for detecting identifications (10) of containers (9) when they are within the detection ranges of the one or more detectors (18a- 18d); moving a first transport container (9) belonging to said plurality of transport containers (9) to a loading floor (F0); loading the first transport container (9) belonging to said plurality of containers (9) on the load receiving unit (7); determining by a control system (11) destination floor (F1-Fn) of the first container (9) comprising detecting the identification (10) of the first transport container (9) with a detector (18a-18d); automatically moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor (F1-Fn) of the first container (9); and unloading the first transport container (9) from the load receiving unit (7) to the destination floor (F1-Fn) of said first container (9). The invention also relates to a method for constructing a building and an arrangement, which implement the aforementioned method.

Patent Agency Ranking