Abstract:
지능형 열차 스케줄링 시스템의 열차 스케줄링 방법은 열차의 노선 정보 및 열차별 운행 시각에 대한 정보를 포함하는 열차 스케줄 정보가 제공되는 단계; 상기 열차 스케줄 정보에 포함된 열차가 정차하는 역을 노드로서 포함하고, 상기 열차 스케줄 정보에 포함된 각 역간의 노선을 호로서 포함하며, 상기 열차 스케줄 정보에 포함된 열차별 운행시각 정보를 포함하는 시간 확장 네트워크를 생성하는 단계 및 상기 시간 확장 네트워크를 기반으로 상기 열차 스케줄에 대한 각 구간별 및 시간대별 통행량에 대한 예측 정보를 산출하는 단계를 포함한다.
Abstract:
PURPOSE: An energy-saving electric train fleet control system is provided to utilize the regenerative power of an electric train in a braking step as a power source of the other electric train operating to an opposite direction in an identical power supply section, thereby minimizing energy consumption and relieving peak power. CONSTITUTION: An operation server(100) controls the schedule information of an electric train(200). The schedule information includes driving schedules of each electric train, data with respect to power consumed in operation to an opposite direction, and data with respect to regenerative power generated in a braking step. The operation server generates the driving schedule of the electric train capable of minimizing energy consumption. The driving schedule is generated on a basis of a schedule of the electric train operating presently. A train control device(210) controls the driving of the electric trains by using the schedule information. [Reference numerals] (100) Operation server; (210) Train control device
Abstract:
PURPOSE: A schedule plan establishment method for considering a range of task completion time of a resident company and task completion time of a crane for loading and unloading of railroad goods in a container terminal is provided to effectively establish a task plan for a container task and equipment management. CONSTITUTION: The most minimal solution of adding ranges of task completion time of a crane and task completion time of a resident company is determined as an initial solution(S100). The best solution is determined among a plurality of neighbor solutions which is generated through an exchange method(S200). A schedule plan of a loading or unloading task of the crane is established by the best solution(S300). [Reference numerals] (AA) Start; (BB) End; (S100) Initial solution generating step; (S110) Resident company grouping step; (S120) Candidate solution generating step; (S130) Initial solution determining step; (S200) Solution improving step; (S210) Target function value calculating step; (S220) Initial solution changing step; (S230) Best solution determining step; (S300) Schedule planning step
Abstract:
본 발명은 종래 주먹구구식으로 크레인일정계획을 수립함에 따른 문제점을 해결하고자 효율적인 장비관리와 컨테이너의 반입 및 반출 작업에 대하여 보다 효과적으로 작업 계획을 수립함으로써, 시간대별 컨테이너 터미널 장치장에서의 트럭의 동선관리가 가능하고, 컨테이너터미널의 여러 운송장치들에 의한 교통혼잡도를 크게 줄이며, 고가의 컨테이너 수송에서의 시간비용을 줄여 전체적인 물류비용을 줄일 수 있는 크레인의 총작업시간과 업주사의 작업시간을 고려하여 자동적으로 크레인의 일정을 계획할 수 있는 컨테이너터미널에서의 철도운송물의 적재 및 하역을 위한 크레인의 작업완료시간과 개별입주사의 작업시간완료시간 범위를 고려한 일정계획수립방법이다.