Abstract:
A concrete track structure reinforced with a pile foundation and a construction and repairing method are provided to prevent ground subsidence without a separate reinforcement of the ground layer because a pile is set up to the rock layer and a concrete track is set up on top. A construction method for a concrete track structure reinforced with a pile foundation is as follows. A roadbed layer(2) is formed on top of a ground layer(3) existing on top of a bed rock layer(4). The ground layer or the ground layer and bed rock layer are bored. The front end of a pile(10) is positioned in the ground layer or bed rock layer. The head of the pile is exposed beyond the top of the roadbed layer. After the pile is constructed, a cap of pile(11) is set up in the head of the pile. A cam plate(21) is installed on top of the pile cap. A HSB(Hydraulic stabilized Base) layer(22) and TCL layer(Track Concrete Layer)(23) are constructed on top of the cam plate. A sleeper(24) is installed on the TCL layer and a rail(25) is fastened thereon.
Abstract:
본 발명은 현장타설식 콘크리트 슬래브 궤도의 콘크리트를 타설하기 이전에 궤광(軌壙)의 시공오차가 생긴 경우, 이를 손쉽게 조정하는 방법에 관한 것이다. 이와 같은 본 발명은 침목부착식 매립형 스핀들을 침목의 일측면에 고정하는 제a1단계와; 상기 침목에 체결구를 이용하여 레일을 고정하는 제a2단계와; 조립된 궤광위에 시공오차 조정용 광학반사경 거치대를 설치하고 여기에 광파측정기로 궤도의 시공오차량을 측정하는 제a3단계와; 상기 광파측정기로 측정된 값을 기준으로 상기 침목의 측면에 고정된 침목부착식 매립형 스핀들을 조정하여 면틀림 시공오차량을 조정하는 제a4단계;로 이루어진 것을 특징으로 한다. 본 발명에 따르면 현장타설식 콘크리트 슬래브 궤도의 설치 공사시에 수직방향의 궤도 면틀림 조정 및 횡방향의 궤도 줄틀림 조정을 간단하고도 신속 정확하게 행할 수 있다. 철도, 선로, 광파, 선형조정
Abstract:
기존의 검측자 등을 이용하지 않고도 레일의 측면에 레이저건 및 모눈 반사판을 설치하여 간단하게 레일의 궤도틀림 및 고저를 측정할 수 있고, 레이저건을 사용함으로써 시인성이 양호하고, 고저 및 거리를 용이하게 측정할 수 있는, 레이저건과 모눈 반사판을 이용한 궤도 고저측정 장치 및 그 방법이 제공된다. 레이저건과 모눈 반사판을 이용한 궤도 고저측정 장치는, 레일의 궤도틀림 및 고저를 측정하도록 레일의 측면의 기준 지점에 설치되는 제1 레이저건; 레일에 제1 레이저건을 장착하는 제1 레이저건 장착부; 모눈이 형성된 반사판으로서, 레일의 측면에 제1 레이저건으로부터 소정 거리 이격된 측정 지점에 설치되고, 제1 레이저건으로부터 발사되는 레이저를 반사하는 모눈 반사판; 및 레일에 모눈 반사판을 장착하는 모눈 반사판 장착부를 포함하되, 모눈 반사판에 형성된 측정점에 의해 궤도의 고저 및 궤도틀림이 산출되는 것을 특징으로 한다.